My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/09/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 10/09/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:19 PM
Creation date
10/4/2012 4:16:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/09/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONNEXUS' <br />ENERGY <br />Your Community Energy Partner <br />Mr, Tim Himmel' <br />City of Ramsey <br />7550 Sunwood Dr NW <br />Ramsey MN 55303 <br />Dear Tim, <br />14601 Ramsey Boulevard <br />Ramsey. iviinrlesota 55303 <br />7I33-323-2540 <br />Fax: 7E3-5 a6-9541 <br />1-80C-642-1672 <br />vywryy. connexu sener py.c and <br />inforgiconnexusienurgy.corn <br />June 11, 2012 <br />I have prepared the following proposal for the removal and reinstallation of streetlights in <br />conjunction with the Sunwood Blvd realignment per your request. Connexus Energy will install, <br />refer ownership, and will provide ongoing maintenance of the Tights under our monthly Energy <br />and Maintenance rate. The installation costs shown below area preliminary estimate prior to the <br />final design by Connexus Energy's engineering department. <br />Please see the attached photometric layout of the design I would recommend for the <br />Sunwood realignment using LED's. This design is based on using 55 Walt LED's lnstead of the <br />current 100 Watt and 70 Weft Metal halide fixtures_ <br />The followine are preliminary estimates prier to final design <br />• Reinstall the same fixtures on new Sianweod.. supplementing as needed. <br />$103,932.00 Includes moving 10 light fixtures, 9 concrete bases, and supplementing <br />14 additional fixtures. Also includes duplex receptacles at 33 tree locations end <br />power to the center of the roundabout, <br />Fleinstall the poles with LED components, supplementing as needed. <br />1 $111,732,00 Includes moving 10 light fixtures, 9 concrete bases, and supplementing <br />i7� <br />,� N 14 additional LED fixtures and upgrading the lights to be moved to LED. Also <br />includes duplex receptacles et 33 tree locations and power to the center of the <br />roundabout. <br />■ Reinstall the poles with LED components, supplementing as needed and installing LED <br />components on all the existing Sunwood poles_ <br />The cost to upgrade all existing Sunwood Metal halide fixtures would be in the $700 <br />to $900 range per fixture. <br />The monthly Energy and Maintenance rate for the 55 watt LED fixtures is $7.96 per light per <br />month. The lights will be installed to utility specifications, will be un-metered, ano will operate on <br />a dusk-tc-dawn schedule. The above installation costs are based upon our best practices. If job <br />MO conditions beyond our control prevent normal installation procedures or if winter <br />construction is required, additional charges may be applied,. <br />Please indicate your choice the options above and return a signed copy via. LISPS, Fax <br />763-506-9541, or a -mail: Ieoo@connexusenergy.com <br />I hope that this Information is satisfactory for you. Do not hesitate to contact me if you have any <br />questions. <br />Sincerely, <br />Leo Offerman <br />IPgi IIIY AIXO N Lea brfewne€r <br />DHICSrIR4SICSAI1 ,a={unpoW4enrgy. <br />flh i-lecomanmeniSOIrtf0-ct1010.0 <br />DATA! 20l206.I1 II 4:34-clod Accepted by: <br />Key Account Representative Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.