<br />To:
<br />Address:
<br />Project Name:
<br />Project Location:
<br />City Of Ramsey
<br />7550 Surimod Drive NW
<br />Ramsey, MN 55303
<br />CSAH 83 & 147th Ave Change Order 02
<br />Zeolite & Bunker, Ramsey, MN
<br />I Item # Item Description
<br />1 Mobilization
<br />2 Clearing
<br />3 Remove Bituminous Pavement
<br />4 Remove 73" Arch Starrn Sewer Bulkhead
<br />5 Sowing 91turnirc us Pavement (Full Depth)
<br />6 Common Excavation
<br />7 Salvaged Topsoil (LV)
<br />8 Topsoil Borrow (LV)
<br />9 Dewatering
<br />10 Aggregate Shouldering (CV) Class 5 Modified
<br />11 Aggregate Base (CV) Class, 5 Modified
<br />12 Type SP 12.5 Wearing Course Mix (4,C)
<br />13 73" Span SRC Pipe -Arch Apron
<br />14 Trash Guard For 73" Arch Apron
<br />15 73" Pipe Sewer Design 3006 CL 11
<br />16 Connect To Existing Storm Sewer
<br />17 Clean Existing Storm Sewer Pipe
<br />18 Connect T' Existing Watertnain
<br />_9 12" DIP Watermaln Class 52
<br />20 4" Polystyrene Insulation
<br />21 DIP Fittings
<br />22 Construct Drainage structure DES 106-4020
<br />23 Casting Assembly
<br />24 Install Casting
<br />25 Random Mass III R,u Rap
<br />26 Traffic Control
<br />27 5rlt Fence, Type Machine 5/iced
<br />28 Erasion Control Blanket, Category 3
<br />29 Seeding
<br />30 Seed Nnxture 190
<br />31 4" Solid Line, White -Paint
<br />32 4" Double Solid Line, Yellow -Pabst
<br />cantad:
<br />Phone:
<br />Fax:
<br />Old Number: 12- 72
<br />Itltd Date: 9/512012
<br />Estimated Quantity Unit
<br />1.O0 LS
<br />0.67 ACRE
<br />390.00 SY
<br />1,00 EACH
<br />123.€i0 LF
<br />1,107.00 Cif
<br />367.OD CY
<br />142.00 CY
<br />1.00 LS
<br />21.10 C7
<br />53,40 C1'
<br />66.33 TON
<br />1.OB EACH
<br />1.00 EACH
<br />210.00 LP
<br />1.00 EACH
<br />140.00 LP
<br />6.00 EACH
<br />54,00 LF
<br />43,0© SY
<br />3,300.00 L8
<br />1,00 EACH
<br />1.O0 EACH
<br />1.00 EACH
<br />16.00 Cv
<br />1.00 L5
<br />650,00 LF
<br />50.00 SY
<br />0.67 ACRE
<br />37.20 LB
<br />40.00 LF
<br />92,00 LF
<br />Shane Nelson
<br />(763) 427-11 10
<br />(763)427-55'3
<br />ltntt price
<br />$2, 500,00
<br />$4,155.00
<br />' ,3.80
<br />$455.00
<br />$3, 90
<br />$4.75
<br />$1,35
<br />$3.85
<br />$14,1300.00
<br />$53.75
<br />$40.75
<br />$129.25
<br />$6,100.00
<br />$ 2,t00.00
<br />$347.00
<br />$1,755110
<br />$24.91
<br />$1, 900.00
<br />$189.00
<br />$63.00
<br />$3.35
<br />$12,750.00
<br />$900.00
<br />$150.00
<br />$95.00
<br />$3,500,00
<br />$1.66
<br />$2.50
<br />$2,550.00
<br />$4.25
<br />$3.25
<br />$6.45
<br />Total Pr1ceI
<br />$2,500.O0
<br />$ 2,7 R3.95
<br />$1,482.00
<br />$455.00
<br />$479.70
<br />$5,258.25
<br />$49145
<br />$545.7©
<br />$14,00 D, 00
<br />$1,134.13
<br />$2,176,05
<br />$6,506.82
<br />$6,100.04
<br />$2,800.C'0
<br />$72,870.00
<br />$1,755.00
<br />43,1137.40
<br />$10,600.130
<br />$1O,216.00
<br />$2,709,00
<br />$11,055.00
<br />$12,750.00
<br />100.80
<br />$150.00
<br />$1,520.00
<br />$3,580.00
<br />$1,079.00
<br />$125,00
<br />$1, 708, 50
<br />$156.10
<br />$130.00
<br />$593.40
<br />Total Bid Price: $ 184,114.35
<br />Notes:
<br />• **If 73' Arai Pipe Class 11 is Not Acceptable, Please add $11,500,00 for Class III (Item 15)**
<br />▪ Price does nat include: Site Surveying; Soil Testing; Concrete Curb Si Gutter; Sidewalk; Detours; Building or Structure Demolition; Hidden or Buried
<br />Debris; Hazardous Materials Removal; Street Sweeping, Import and/or Deport of Dirt; Site Utilities other than those listed above; Any Permits;
<br />Moving of Small Utilities; Any Subsoil Corrections nr Trenrh Borrow
<br />9j5j2012 5!14:20 PM Page I of 2