Laserfiche WebLink
revised August 9th, 2012. The Plans shall not be attached to this Contract, but are in CITY <br />files. <br />3. Stage I CITY Improvements Required. The improvements the CITY requires are as follows: <br />a. Streets — construction of Sunwood Drive (already constructed) <br />b. Concrete curb and gutter — along Sunwood Drive (already constructed) <br />c. Street traffic control signals — for Sunwood Drive (already constructed) <br />d. Lot grading (already complete) <br />e. Sidewalks — along Sunwood Drive (already constructed) <br />f. Boulevard sodding — from back of curb to sidewalk <br />("Stage I CITY Improvements") <br />The CITY agrees to construct the Stage I Improvements according to the terms and conditions of <br />this Contract and in accordance with the Plans. <br />4. Stage I PERMITTEE Improvements Required. The improvements the CITY requires that <br />are to be constructed by the PERNHTTEE are as follows: <br />a. Trunk and lateral sanitary sewer <br />b. Trunk and lateral water main <br />c. Storm drainage facilities <br />d. Streets — internal shared access/private driveway <br />e. Street traffic control signals — at access points to Sunwood Drive <br />f. Trail development <br />g. Sidewalks <br />h. Electricity — (appears to be already constructed) <br />i. Phone — (appears to be already constructed) <br />j. Natural gas — (appears to be already constructed) <br />k. Boulevard sodding — from sidewalk to property line <br />1. Water shut off boxes <br />m. Easement acquisition <br />n. As -built plans <br />o. Stage I financial surety <br />("Stage I PERMITTEE Improvements") <br />The PERNHTTEE agrees to construct the Stage I PERMITTEE Improvements according to the <br />terms and conditions of this Contract and in accordance with the Plans. The final construction <br />plan for the Stage I Improvements shall be submitted to the CITY Engineer for review and <br />approval prior to commencement of construction. <br />The PERNHTTEE agrees to provide specifications, subject to review and approval of the City <br />Engineer, for construction and restoration of utilities within existing rights of way. Work must be <br />completed under traffic, be brought up to grade, and must restored to existing conditions within <br />24 hours. <br />The PERNHTTEE shall be responsible for completing the rough grading of the Plat and <br />providing lot corner stakes prior to the installation of underground utilities as set forth above. <br />