My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/16/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 10/16/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:31:42 AM
Creation date
10/11/2012 3:59:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/16/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH PINE <br />AGGREGATE INC. <br />14551 Lake Drive 1 Forest Lake, MN 55025 1 651.464.6802 <br />October 10, 2012 <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Attn: Shane Nelson <br />Re: CSAH 83 (Armstrong Blvd) & 147 / Sunwood Drive Intersection <br />Intersection Improvements; Request for Completion Extension <br />Shane, <br />Due to unforeseen circumstances out of North Pine Aggregate's control, I would like to <br />request an extension for completion. Currently, all work under our contract, except <br />maintenance work and final clean up shall be completed on or before November 15, <br />2012. At this time, there is a possibility that the Irrigation & Landscaping work may <br />need to finish in the spring, due to numerous utility relocations & conflicts. We <br />anticipate that the Irrigation will be fully installed, but charging of the system (weather <br />dependent) may need to hold off until spring. There are approximately 10 plantings that <br />are to be installed around the Irrigation Box that will act as a natural shield, these may or <br />may not be installed this year depending on what the weather does. <br />As stated in my letter dated September 27, the Mast Arms for the Signal System are <br />scheduled for delivery at some point in December. The timing for the Mast Arms has not <br />yet changed. All of the bases with the exception of one (due to utility conflicts) are <br />currently installed. Once the Mast Arms are delivered it is anticipated that installation <br />will take place immediately. <br />Currently there are various outstanding pending decisions that need to be made in order <br />to continue with positive progress. On the 146 Avenue portion of the project, there are <br />some proposed changes still being discussed in regards to Storm Sewer modifications and <br />the conflicting Easement issue with Wiser Choice Liquor. The Irrigation Service location <br />is still being addressed, along with numerous Light Pole relocations progress for <br />Sidewalk installation has been hindered. There is a chance that some sidewalk may not <br />be installed this fall. <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.