My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/16/2012 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 10/16/2012 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:44 PM
Creation date
10/19/2012 11:43:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
10/16/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Building Facade. The PERMITTEE agrees to construct the building in accordance with the site <br />plan and architectural elevations prepared by Landform Professional Services dated September 5, <br />2012, revised September 27, 2012, and approved by the City Council on October 16, 2012. <br />Required Improvements. The PERMITTEE shall construct and install the following site <br />improvements on the Subject Property in accordance with the specifications and location as <br />shown on the Site Plan. The Required Improvements are as follows: <br />a. Site grading in accordance with the Grading Plan prepared by Landform Professional <br />Services dated September 5, 2012, revised September 27, 2012. <br />b. Private storm sewer and appurtenances. <br />c. Private sanitary sewer system <br />d. Private watermains and appurtenances <br />e. Private trunk and lateral storm drainage facilities <br />f. Bituminous driveways, parking lots, and maneuvering areas, including access to Sunwood <br />Drive. <br />g. Continuous, 136/12 concrete curbing and gutter around the perimeter of all bituminous <br />surfaces. <br />h. Installation of Landscaping in accordance with the Landscape Plan prepared by Landform <br />Professional Services, dated September 5, 2012, revised September 27, 2012. <br />i. Irrigation metering and backflow devices shall be approved as part of the Utility Plan, and <br />installed accordingly. <br />j. Irrigation rain sensors shall be installed and appropriately placed throughout the <br />development. <br />k. Establishment of turf in areas disturbed during construction and in accordance with the Site <br />Plan. <br />1. Temporary and permanent erosion control. <br />("Required Improvements)". <br />The PERMITTEE agrees to construct the Required Improvements according to the terms and <br />conditions of this agreement and in accordance with PERMITTEE's plans submitted to the CITY. <br />8. Required Improvements Completion Date. The Required Improvements shall be <br />completed on or before October 16, 2013. <br />9. Required Improvements Financial Guarantee. In order to ensure the installation of the Required <br />Improvements in accordance with CITY specifications and in a timely manner, the PERMITTEE <br />shall be required to deposit with the CITY a cash escrow or letter of credit, approved as to form by <br />the CITY, in the amount of Dollars and No Cents. ($ .00), which <br />is 150% of the CITY's estimated cost of the Required Improvements. Prior to the issuance of the <br />building permit, all financial guarantees must be provided as required herein. <br />Upon completion of the construction of the Required Improvements, the financial guarantee shall be <br />returned to the PERMITTEE and the PERMITTEE shall be required to provide the landscaping <br />maintenance guarantee described in Item 414 of this Development Agreement. The determination of <br />completion of the construction of the Required Improvements shall be made by the City Council <br />after consultation with the City Engineer. In the event the PERMITTEE fails to construct and <br />install the Required Improvements as required herein, the City Council may order the completion of <br />the Required Improvements with CITY day labor and/or by letting contracts for said completion and <br />Super America <br />Development Permit <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.