My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/23/2012
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2012
>
Agenda - Council Work Session - 10/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:25:24 PM
Creation date
10/19/2012 12:06:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Work Session 2. 2. <br />Meeting Date: 10/23/2012 <br />By: Shane Nelson, Engineering/Public <br />Works <br />Title: <br />Sunwood Drive Project - Consider Change Order #4 <br />Background: <br />The City Council previously approved the construction contract for City Project 12-20. This Change Order is <br />associated with drainage, storm sewer, irrigation, and construction signage. <br />The 146th Storm Sewer item is related to the drainage along the west side of Armstrong Blvd. The original <br />drainage plan contemplated a ditch on the west side at a sufficient depth to carry the drainage. However, during <br />construction the drainfield for the property at 8019 146th Ave (Diversified Paving) was encountered. Also, there <br />are several large utility cabinets that are within a private easement at the NW corner of Armstrong Blvd and 146th <br />Avenue. Because of these two constraints, a ditch cannot be constructed per the original design and the design <br />engineer has proposed an alternate solution. <br />The Draintile Swale item is related to the drainage at 14700 Armstrong Blvd (Billmark Electric). The grade at the <br />intersection of Armstrong Blvd and 147th Avenue was raised approximately 8 feet, and there is currently a 4:1 <br />slope from the edge of the road to the existing ground that surrounds the parking lot for Billmark Electric. <br />Whatever drainage system was existing before construction was covered with fill to provide the slope. The drain <br />tile was proposed as a solution to this drainage problem by the design engineer. <br />The Irrigation Service is related to the new irrigation system on Sunwood Drive. The original plans contemplated <br />connecting to the existing 2" main irrigation lines on the east end of the project. City staff has informed us that the <br />proposed design would not work, as the water supply from the east is coming all of the way from Ramsey Blvd, and <br />a new 4" water supply was required on the west end of Sunwood Drive. <br />The Additional Construction Signage is related to the advance warning "Road Closed" signs. Before the project <br />began, large signs were installed on Highway 10 and Armstrong Blvd with the message "CR 83 Road Closed" and <br />"Follow Detour". The plans did not call for a different message after the roadway was opened, and the signs could <br />not be removed as they are required to warn motorists that they are entering a construction zone. <br />The Irrigation Box change order item was requested by City Staff. The plans contemplated salvaging and re -using <br />the existing irrigation box. However, the existing irrigation box is damaged and does not appear suitable for <br />re -use. This change order item would replace the old damaged irrigation box with a new irrigation box. <br />The Additional Pipe Removal item was requested by the Development Manager. The pipe is in the area of the <br />COR TWO retail area, and was a stub for future development that will never be utilized given the new <br />development plans. The storm sewer stub was in the vicinity of the building pad location for Lot 3, Block 1, <br />COR TWO. <br />Notification: <br />
The URL can be used to link to this page
Your browser does not support the video tag.