My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/23/2012
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2012
>
Agenda - Council Work Session - 10/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:25:24 PM
Creation date
10/19/2012 12:06:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45ioRTN PINE <br />AGGREGATE INC. <br />14551 Lake Drive i Forest Lake, MN 55025 1651.464.6802 <br />To: City 4f Ramsey Contact: <br />Address: 7550 Sunwood Drive NW I Phone: (7E3)427-1410 <br />Ramsey+, MN 55303 Fax: (763) 427-5543 <br />Project Name: CSAH 83 & 147Ui Ave Change Order #4 REV A Bid Number: 12-047 <br />ProjectLotatlons Existing Sunwaod Drive & Access Drive, Ramsey, MN Bid Date: 10/17/2012 <br />Notes: <br />• Price does not IncIudc-Claar -Grubbing; Site SJrve 1ng; Soil Testinv Gravel or Bituminous: Building or Structure Demolition; Hldcen or Buried <br />Debris; Hazardous Materials Removal; DewraterIng; Import endjpr Expott of Dirt; Slte Utilities other than those Ilsted above; Moving of Small <br />Utilities; Any Subsoil Corrections or Trench Borrow; Traffic Control; <br />• Pricing Is based on die engineer(s) plans dated; change order #3 dated 9/14/12, shts 4AR, 22r0.R,25A t,25AR,34AR,28R,48R <br />• Proposal is valid for 0 period of 30 days from date of proposal. <br />• Any delays due to Incomplete surveying or Improper surveying could result in addlticnai charges, <br />• Price does not Include lowering{moving small utilities. 1f there are utilities not properly represented on plans, price is subject to change. <br />• All grading reeds to be verified by civil engineer as grading Is completed, <br />Payment Terms: <br />Net due upon receipt of billing. A 1.5% per month service charge will be asssssed On unpaid balance. <br />ACCE PIT o; CONFIRMED. <br />Tito above prices, specIficatiorrs and conditions are satisfactory and <br />are hereby accepted. <br />Buyer: <br />Signature: Authorized Signature: , 4%6. <br />g <br />Date of Acceptance: Estimator: Keith Herrne'h <br />North Pine Aggregate, Inc. <br />1rrd1772o-12 a:1E;p3 PN1 <br />Faye 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.