My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/23/2012
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2012
>
Agenda - Council Work Session - 10/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:25:24 PM
Creation date
10/19/2012 12:06:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDUIT USE AGREEMENT <br />This Conduit Use Agreement ("Agreement") is made and entered into this 24th day of April, 2012 (the "Effective <br />Date"), between the City of Ramsey, Minnesota ("City") and Zayo Group, LLC ("Zayo"). <br />RECITALS <br />WHEREAS, City owns a four -inch (4") PVC conduit system located between Ramsey Boulevard west along <br />Sunwood Drive to Armstrong Boulevard, as more completely described in Exhibit A attached hereto (the "Conduit <br />System"); and, <br />WHEREAS, Zayo desires to obtain from City and City desires to provide to Zayo, a license to use the Conduit <br />System; <br />NOW, THEREFORE, in consideration of the mutual covenants in this Agreement and other just and adequate <br />consideration, the Parties hereby agree as follows: <br />I : LICENSE. As of the Acceptance Date for the Innerducts, City agrees to issue a license to Zayo, and Zayo <br />agrees to accept a license from City, the Conduit System as described in Exhibit A and under the terms and <br />conditions as further described below (the "License"). <br />2. INSTALLATION AND ACCEPTANCE. <br />2.1 Installation. The Conduit System consists of a vacant four -inch (4") PVC conduit. In <br />consideration of this License, Zayo agrees to provide all labor, materials and equipment required to engineer and <br />install within the Conduit System three (3) inch -and -a -quarter (1.25") SDR 11 innerducts (collectively, the <br />"Innerducts"). Zayo shall also install two (2) handholes, one (1) for Zayo's use and one (1) for City's use. Zayo <br />shall install the lnnerducts and handholes according to the Zayo construction drawings ("Zayo Construction <br />Drawings"), attached hereto as Exhibit B. <br />2.2 Installation Date. The Innerducts are estimated to be installed within sixty (60) days of the full <br />execution of this Agreement (the "Estimated Completion Date"). City acknowledges that the Estimated Completion <br />Date may change due to unforeseen construction conditions. In the event Zayo encounters any changes to the <br />Estimated Completion Date, Zayo shall promptly notify City and provide a revised estimated completion date (the <br />"Revised Estimated Completion Date"). <br />2.3 Innerduct Acceptance Procedures. Prior to commencement of the Term of this Agreement as <br />defined in Section 3 below, Zayo shall perform necessary tests to verify that the Innerducts have been installed <br />according to the Zayo Construction Drawings and shall promptly provide City with a report of such test results <br />("Notice of Completion"). City shall promptly review the Notice of Completion and shall provide Zayo with a <br />written notice accepting (or rejecting by specifying the defect or failure in the Notice of Completion that is the basis <br />for such rejection) the lnnerducts. If the City fails to notify Zayo of its acceptance or rejection of the final test <br />results with respect to the Innerduct within twenty (20) business days after City's receipt of such Notice of <br />Completion, City shall be deemed to have accepted the Innerducts. The date of such notice of acceptance (or <br />deemed acceptance) of the Innerducts shall be the "Acceptance Date." In the event of any rejection by City, Zayo <br />shall take such action reasonably necessary and as expeditiously as practicable to correct or cure such defect or <br />failure and the process acceptance shall be repeated. The foregoing notwithstanding, if City uses any portion of the <br />Innerducts prior to acceptance, such use shall constitute acceptance with an Acceptance Date effective as of the <br />earliest documented use by City. <br />2.4 Confiauration and Access to the Innerducts. Of the three (3) inch -and -a -quarter (1.25") SDR 11 <br />innerducts installed, one (1) will be routed into a Zayo handhole (the "Zayo Innerduct'') to be used exclusively by <br />Zayo to make available telecommunications services in and through the City of Ramsey, Minnesota. The other two <br />(2) innnerducts will be routed to a City handhole (the "City Innerducts") to be utilized by the City in accordance <br />with this Agreement. <br />Confidential <br />
The URL can be used to link to this page
Your browser does not support the video tag.