My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/23/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 10/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:58 PM
Creation date
10/19/2012 1:33:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/23/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 I Process, Services, Deliverables <br />As a client -centered firm, Foth takes its lead from the needs and desires <br />of the client. We understand the needs of the City of Ramsey as stated <br />in its RFP and the Anoka County Solid Waste Master Plan. Our Scope <br />of Work was designed to create an efficient process flow that will <br />ensure success of this project. <br />Specifically, the Kick-off meeting will clarify the City's vision for the <br />project, specific tasks to be completed, project timelines, and City val- <br />ues for the success of the project. Information that Foth will need from <br />the City to complete the project will be requested and any optional or <br />additional tasks will be formalized. The project memo delivered at <br />the completion of Task 1 will ensure that all parties are "on the same <br />page." <br />As Foth develops the facility plan, there will be contact with City staff <br />to make sure that the Zoning and Planning requirements of the City <br />are met and that Foth remains on -track with timelines and deliverables. <br />As Foth builds the matrix of design and operations options, we will <br />leverage those contacts and conduct meetings, tours and other optional <br />activities that the City selects. At approximately fifty percent (50%) <br />project completion, Foth will request a meeting with the project team <br />to update all parties on progress of the project and make any mid -point <br />corrections needed. <br />The Final Report will be delivered to the City first in draft form, for <br />review and comment. Finalization of the report, meetings with the <br />project team and others, draft revisions, and next steps will occur in <br />partnership with the City, in compliance with the project contract. <br />Information Needed from the City <br />The Kick off meeting will clarify and finalize the City's goals for the <br />project. At that time, the specific information that Foth will need from <br />the City will be determined. At this time, it is expected that Foth will <br />ask for: <br />• Tonnage and participation data at previous event collections; <br />• A meeting with the Ramsey Community Development and <br />Engineering Departments to understand the zoning and building <br />requirements of the City for the recycling facility; <br />• Access to maps or other documents for eventual determination of <br />potential locations for a recycling facility; <br />• Traffic, water and sewer line information for eventual determination <br />of potential locations for a recycling facility; <br />• Existing contracts with potential operations contractors or the city <br />"standard" for contracts with possible future partners. <br />Recycling Drop -Off Center Analysis & Plan Development <br />City of Ramsey, MN —October 2012 <br />*Foth <br />4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.