My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/23/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 10/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:58 PM
Creation date
10/19/2012 1:33:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/23/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 7 <br />Cost <br />SAIC's hourly rate for services is $150 per hour; billing is invoiced in 15-minute increments. The total <br />not -to -exceed project cost is $30,000. <br />The table below shows the detailed fee listing, by task, inclusive of professional services and out-of- <br />pocket expenses. <br />Task Cost <br />Task 1 - Scoping Meeting, Project Initiation and Data Request <br />Task 2 - Assess Current Recycling Program and Future Needs <br />Task 3 - Conduct Facility Programming for Recycling Drop-off Center <br />Task 4 - Evaluate Options for Implementation <br />Task 5 - Draft Report and Present the Results <br />Total <br />$2,000 <br />$3,000 <br />$15,000 <br />$5,000 <br />$5,000 <br />$30,000 <br />Additional Services that could be provided by SAIC include the following: <br />• Detailed Design — Including civil, structural, electrical, landscape and construction phasing drawings; <br />• Environmental Assessment, Permitting, Utility Agreements — Including local, state and federal <br />assessments and permitting; <br />• Public Meetings — Including preparation of handouts and presentation materials for meetings or <br />workshops; <br />• Bidding Assistance — Including bid documents, pre -bid meetings, bid analyses, and recommendations <br />for award; and <br />• Construction Period Services — Including review of shop drawings and submittals, response to <br />contractors' requests for information, field inspections, assistance with change order requests, etc. <br />The above examples are provided for information only and are not included in the fees proposed <br />SAIC Energy, Environment & Infrastructure, LLC I 7-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.