Laserfiche WebLink
6.03: Public Hearing: Request for Sketch Plan Review of NORTHGATE ADDITION <br />(minor Plat) and Request for Site Plan Review and Conditional Use Permit for <br />Northgate Performing Arts Center at the North East Intersection of Sunwood Drive <br />and Peridot Street; Case of PSD, LLC and Northgate Church <br />Public Hearing <br />Chairperson Levine called the public hearing to order at 7:45 p.m. <br />Presentation <br />Planning Consultant Goodroad presented the Staff report. She explained Northgate Church is <br />proposing construction of a performing arts center that will include 504 auditorium seats, two <br />classrooms, along with a nursery and lobby areas on the property for the parcel located on the <br />northeast comer of Sunwood Drive and Peridot Street NW. Northgate Church is requesting <br />Sketch Plan Review of NORTHGATE ADDITION (Minor Plat) along with site plan review and <br />a conditional use permit for the proposed Northgate Performing Arts Center. In order to <br />accommodate the request, the parcel must be platted as part of the request for NORTHGA1'E <br />ADDITION. <br />Planning Consultant Goodroad explained the subject property is zoned Mixed Use and is located <br />within the COR3 sub -district. Institutional uses are allowed as a conditional use. The proposed <br />structure is 15,242 square feet in size with a future expansion area identified on the site plan <br />immediately north of the proposed structure of approximately 13,000 square feet. Staff reviewed <br />the proposed site plan in detail with the Commission. She discussed a proposed street presence <br />to meet the 60% standard along Sunwood Drive. <br />Planning Consultant Goodroad discussed the parking issues with this site noting shared parking <br />would be needed on Sunday mornings and Wednesday nights. City requirements call for a total <br />of 101 parking stalls and the applicant is proposing 43 stalls. In addition, 40 proof of parking <br />stalls (on -site) and 25 on street parking stalls were available to fulfill the parking requirements. <br />She noted it was the intent in the COR that sites minimize surface parking and create strategies <br />for shared parking between adjacent users particularly when taking advantage of peak and off <br />peak parking cycles. Staff is generally supportive of the use of on -street parking for the <br />proposed use, as no parking structures were planned in this area. <br />Planning Consultant Goodroad discussed the parking situation in further detail stating the City <br />could require proof of parking to be installed with Phase I due to lack of legally recordable <br />shared parking agreements to meet City requirements of the COR Design Framework. However, <br />another option would be for the City to accept the proof of parking plan with a condition that at <br />such time that parking demand is beyond what is provided on -site and the 25 accepted on -street <br />parking stalls, and extending into additional on -street parking areas beyond 300' radius of the <br />site, such proof of parking shall be installed at the applicants expense. Staff recommended that <br />Phase 2 construction not move forward without recordable cross -parking agreements in place. <br />