Laserfiche WebLink
The irrigation service is required to provide adequate water supply to the west end of Sunwood Drive. The City <br />previously had a 4" irrigation service on the west end with the old alignment, and the pressure was adequate, but <br />that supply was lost with the re -alignment of Sunwood Drive. Recently (in 2012) the valve for the existing service <br />on the west end has been inoperable due to the vertical alignment of the valve box and has been stuck in the off <br />position. Therefore the City has firsthand knowledge that pressure is inadequate when the supply is coming all of <br />the way from Ramsey Blvd. Conversely, the pressure was adequate when a western supply was available. This <br />change order item is to compensate the Contractor for work already completed, as a decision was necessary to <br />facilitate construction of the sidewalk. <br />The Additional Construction Signage is also to compensate the Contractor for work already performed. Before the <br />project began, large signs were placed on Highway 10 and Armstrong Blvd with the message "CR 83 Road Closed" <br />and "Follow Detour". The plans did not call for a different message after the roadway was opened, and the signs <br />could not be removed as they were warning motorists that they are entering a construction zone. We requested that <br />the Contractor replace the "Road Closed" message with "Road Work" and blank out the "Follow Detour" message. <br />The Irrigation Box item work has not been completed and the City could choose not to approve this change order <br />item. If this change order item is not approved, the existing irrigation box will be moved to the new location. <br />The Additional Pipe Removal item is an item that compensates the Contractor for work already completed. This <br />pipe was removed in the COR TWO retail area, and was a storm sewer stub that was not planned to be utilized, <br />therefore the Development Manager directed the Contractor to remove the pipe. <br />Recommendation: <br />We recommend that the City approve Change Order #4 in the amount of $22,645.79. <br />Funding Source: <br />The funding package has previously been identified. The funding source for any overages from the original budget <br />is the Equipment Revolving Fund. Staff has prepared a separate City Council Work Session case to review the <br />overall funding for the project and the expenditures to date. <br />Council Action: <br />Motion to approve Change Order #4 in the amount of $22,645.79 <br />Change Order Number 4 <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 10/18/2012 04:21 PM <br />Hakanson Anderson Engineering (Originator) Shane Nelson 10/18/2012 04:29 PM <br />Kurt Ulrich Jo Thieling 10/18/2012 04:41 PM <br />Form Started By: Shane Nelson Started On: 10/15/2012 09:35 AM <br />Final Approval Date: 10/18/2012 <br />