My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/23/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 10/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:58 PM
Creation date
10/19/2012 1:33:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/23/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The irrigation service is required to provide adequate water supply to the west end of Sunwood Drive. The City <br />previously had a 4" irrigation service on the west end with the old alignment, and the pressure was adequate, but <br />that supply was lost with the re -alignment of Sunwood Drive. Recently (in 2012) the valve for the existing service <br />on the west end has been inoperable due to the vertical alignment of the valve box and has been stuck in the off <br />position. Therefore the City has firsthand knowledge that pressure is inadequate when the supply is coming all of <br />the way from Ramsey Blvd. Conversely, the pressure was adequate when a western supply was available. This <br />change order item is to compensate the Contractor for work already completed, as a decision was necessary to <br />facilitate construction of the sidewalk. <br />The Additional Construction Signage is also to compensate the Contractor for work already performed. Before the <br />project began, large signs were placed on Highway 10 and Armstrong Blvd with the message "CR 83 Road Closed" <br />and "Follow Detour". The plans did not call for a different message after the roadway was opened, and the signs <br />could not be removed as they were warning motorists that they are entering a construction zone. We requested that <br />the Contractor replace the "Road Closed" message with "Road Work" and blank out the "Follow Detour" message. <br />The Irrigation Box item work has not been completed and the City could choose not to approve this change order <br />item. If this change order item is not approved, the existing irrigation box will be moved to the new location. <br />The Additional Pipe Removal item is an item that compensates the Contractor for work already completed. This <br />pipe was removed in the COR TWO retail area, and was a storm sewer stub that was not planned to be utilized, <br />therefore the Development Manager directed the Contractor to remove the pipe. <br />Recommendation: <br />We recommend that the City approve Change Order #4 in the amount of $22,645.79. <br />Funding Source: <br />The funding package has previously been identified. The funding source for any overages from the original budget <br />is the Equipment Revolving Fund. Staff has prepared a separate City Council Work Session case to review the <br />overall funding for the project and the expenditures to date. <br />Council Action: <br />Motion to approve Change Order #4 in the amount of $22,645.79 <br />Change Order Number 4 <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 10/18/2012 04:21 PM <br />Hakanson Anderson Engineering (Originator) Shane Nelson 10/18/2012 04:29 PM <br />Kurt Ulrich Jo Thieling 10/18/2012 04:41 PM <br />Form Started By: Shane Nelson Started On: 10/15/2012 09:35 AM <br />Final Approval Date: 10/18/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.