My WebLink
|
Help
|
About
|
Sign Out
Home
09/04/12 Work Session
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Minutes
>
2010's
>
2012
>
09/04/12 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 11:16:24 AM
Creation date
10/29/2012 1:54:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Housing & Redevelopment Authority - Work Session
Document Date
09/04/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
It was the consensus of the HRA to direct staff to complete design concepts and framework <br />modifications, as discussed, and proceed with the preparation of Appendix B and modifications <br />to the Design Framework. <br />3. DEVELOPMENT TEAM REPORT <br />Development Manager Lazan reported on an issue with the location of a Connexus switch on the <br />new Sunwood alignment. He indicated Landform had provided Connexus with detailed <br />information and a CAD file last fall on the location of the switchgear. Connexus acknowledged <br />receipt; however, this summer Connexus installed the switchgear in an incorrect location on <br />HRA property. Connexus has now indicated it wants. $10,000 to relocate the switchgear. <br />Commissioner Backous asked who Connexus told they were putting in the switchgear that did <br />not know the history. <br />Development Manager Lazan explained that City inspectors were in the job trailer when <br />Connexus told them about installing the switchgear. Landform inspectors did not discuss the <br />location of the switch boxes. Development Manager Lazan displayed the exhibit provided to <br />Connexus that identified the exact location and dimensions to the decimal point for the <br />switchgear. <br />HRA Executive Director Ulrich stated staff will ask Connexus to move the switchgear at its <br />expense. <br />Development Manager Lazan provided an update on negotiations. <br />Development Services Manager Gladhill reported that staff received the site plan for Northgate <br />Church on a PSD owned property and Stoney River closed on 6.5 acres of the Lord of Life <br />campus and is now working on financing. <br />HRA Executive Director Ulrich stated Parks & Assistant Public Works Superintendent <br />Riverblood is researching grants to move the old City Hall. <br />HRA Executive Director Ulrich indicated that the City had budgeted $150,000 for environmental <br />work at the old municipal center site; however, Connexus has agreed to do the prequalification <br />consultant studies for the data center. <br />Development Manager Lazan promoted the upcoming HRA sponsored event at The Draw. <br />Commissioner Backous referenced articles contained in the September /October Ramsey Resident <br />relating to the close of property sales including Wiser Choice Liquor. He pointed out that at the <br />time this newsletter went to press, those sales had not yet concluded, which he found to be a <br />serious infraction. <br />Housing and Redevelopment Authority / September 4, 2012 <br />Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.