My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 09/18/2012
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2012
>
Minutes - Public Works Committee - 09/18/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:10:09 PM
Creation date
10/31/2012 10:26:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
09/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Elvig asked how an eight -foot trail was included in the specifications since the <br />City has a policy of ten -foot trails. <br />Development Manager Lazan reviewed that this item was before the HRA for additional <br />easement and WSB prepared the Armstrong Boulevard plans but did not understand that Ramsey <br />had a policy of ten -foot trails. He noted it had also been discovered that too many utilities were <br />located at the intersection so additional easement was secured from the HRA for a ten -foot trail. <br />Chairperson Backous asked if the project plan also directed public water drainage onto private <br />property. <br />Development Manager Lazan explained that south of Sunwood Drive, the plan did not <br />accommodate commercial development. He noted that adding the curb section will get drainage <br />down to a swale and had this situation been caught originally, this would have been the fix so <br />"no harm /no foul." <br />Interim Engineer Nelson stated they surveyed the existing ground prior to designing the project <br />but should have designed for the design grades with built up pads. <br />Councilmember Elvig asked about the internal process for staff to look at the engineering <br />drawings and determine whether or not they will work. <br />Interim Engineer Nelson stated he was not with Ramsey at the time the plans were reviewed but, <br />generally, the City Engineer assures the plans fit when different engineers and design teams are <br />working on plan components. <br />Councilmember McGlone noted these project plans were done when we had City Engineer, not a <br />consulting engineer. <br />Chairperson Backous stated he understands things happen but there seems to be a constant flow <br />of change orders, which is of concern. He noted without change orders, it means the best project <br />estimate carne forward. <br />Councilmember McGlone stated rather than "pointing fingers" maybe the City Council needs to <br />look at whether the best (lowest) price results in generating more change orders. He shared the <br />concern of change orders, noting the City has professionals to review the plans. <br />Councilmember Elvig agreed this is an age old problem and his question was one with process to <br />assure it was thorough enough to catch these issues and eliminate or reduce change orders. <br />City Administrator Ulrich stated these errors were in the review process, not in preparation of the <br />bid. He agreed City staff should know when plans are reviewed that the policy is for ten -foot <br />trails. <br />Councilmember McGlone stated a septic was also missed with this project. <br />Public Works Committee / September 18, 2012 <br />Page 9of16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.