Laserfiche WebLink
Regular Planning Commission 5. 2. <br />Meeting Date: 05/03/2012 <br />By: Tim Gladhill, Community Development <br />Information <br />Title: <br />PUBLIC HEARING: Consider Request for Variance to Platting Requirements at 7040 173rd Ave NW; Case of <br />Makowsky Family Farm, LLC <br />Background: <br />On February 28th, 2012, the City received an application for a Variance to Platting Requirements to allow a metes <br />and bounds subdivision at 7040 173rd Ave NW. Please note that this is considered a procedural variance under the <br />City's Subdivision Code, and does not derive it's ability from the same enabling statute under the typical Zoning <br />Code. As such, the Planning Commission does have more latitude in granting this type of Variance. <br />The request is to split an existing fifty-six (56) acre parcel into two (2) parcels. Parcel A will contain all existing <br />structures and the existing dwelling unit. The remaining parcel (Parcel B) will remain vacant until re -platted in the <br />future. <br />Notification: <br />Staff attempted to notify all Property Owners within 350 feet of the Public Hearing via Standard US Mail. The <br />Public Hearing was also published in the Anoka County Union. <br />Observations: <br />Staff considered the request under the following conditions: <br />1. No new buildable lots shall be created <br />2. All future subdivision shall be completed in accordance with City Code requirements related to Platting <br />3. The Subdivider shall provide a thirty-three (33) foot wide perpetual/permanent road easement along the entire <br />northern property line to ensure the capability of future roadway connections to serve future development in <br />the event the two (2) parcels are sold separately <br />4. The Subdivider shall enter into a Development Agreement with the City agreeing to the terms above <br />The subdivision would create a 7.5 acre parcel that would ensure that all structures are consistent with applicable <br />zoning regulations. The remaining parcel would be approximately 49.5 acres. The required easement shall specify <br />that said easement can also be used for drainage, utility, and trail purposes and shall be all inclusive. In addition, the <br />Subdivider shall be required to dedicate standard perimeter drainage and utility easements internal to Parcel A. <br />Funding Source: <br />All costs associated with reviewing the application are the responsibility of the Applicant. <br />Staff Recommendation: <br />Staff recommends approval of the request, contingent upon the Subdivider entering into a Development Agreement <br />that restricts the use of Parcel B and requires that any future subdivision is completed in accordance with Platting <br />requirements. <br />Committee Action: <br />