My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/25/2003 - Special Meeting
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2003
>
Agenda - Planning Commission - 06/25/2003 - Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:31:13 AM
Creation date
11/5/2012 11:51:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Special Meeting
Document Date
06/25/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Plat Review: Town Center Gardens <br />May 30, 2003, Revised June 23, 2003 <br />Page 3 of 4 <br /> <br />Trail Development and Trail Fees: The current trail development fee is $475.00 per unit and is <br />due prior to recording the plat. The rate in effect when the subdivision receives final plat <br />approval will be required. Initial staff review indicates that a trail will be required along the west <br />side of Ramsey Blvd. The Ramsey Park and Trail Map shows the west side of Ramsey Blvd. to <br />have a trail. Past practice has been to not allow for trail credit for trail construction in areas <br />where trails are shown on the City of Ramsey Park and Trail Map. The trail should be <br />constructed up to 149th Ave. If so requested, the Park and Recreation Commission will look at <br />the possibility of giving credit for that portion of the trail along Ramsey Blvd. that is not on or <br />adjacent to the property that is part of the plat. (Namely Lot 2, Block 1, Town Center North). <br />Please contact Mark Boos, Parks/Utilities Supervisor at (763) 286-0833 with any questions you <br />have with trails. <br /> <br />Open Space: City Ordinances require that at least 40% of the development consist of open <br />space. Qualifying areas include grassed lawns, landscaped areas, gardens, natural areas, <br />landscape rock, mulch, wetlands, and ponding areas. At least 10% of the open space must be <br />shown as an easily identifiable common area for the use .of the surrounding residents. The <br />preliminary plat appears to show at least 70% of open space in the area to be developed. Based <br />on staff review, it appears that about 1.05 acres of identifiable open space will be needed. The <br />development shows an area that is approximately 1.1 acres in size (Lot 5, Block 5 which is <br />located on the northern edge of the development site). In addition, the plat shows a ½ acre area <br />to be reserved as open space (Lot 8, Block 1 in the southeast comer of the development site). Lot <br />5, Block 5 meets the open space requirement. <br /> <br />Stormwater Management Fee: The City has enacted a stormwater management fee of $375.00 <br />per unit that will be due prior to the City releasing the plat for recording. <br /> <br />Tree Preservation Plan: A tree survey was submitted along with the landscaping plans. The <br />survey indicates that there are roughly 120 existing trees on the site. However, after visiting the <br />site, it was clear there was a large area of the land covered by young elms and other vegetation <br />that was not noted on the plan. The survey also shows that all existing tr~es are being removed <br />to facilitate this development. <br /> <br />The tree survey shows that there are several Hackberry trees that could be considered significant. <br />There is a clump of Hackberry trees, ranging from 8" to 19" in diameter, that appear to be in an <br />area that may allow for them to be preserved (#'s 6793, 6794, 6795, 6796, and 6799 on the tree <br />survey). Furthermore, at the northwestern corner of the proposed development there are several <br />large Cottonwood trees, some Red Cedars, and possibly a couple, other species of trees that do <br />not appear to interfere with the construction, yet they are noted as being removed..Every effort <br />should be made to preserve any trees that feasibly can be saved. One other area that may present <br />some options to preserve some existing trees would be in the southeastern corner of the proposed <br />development, in and around the proposed green space. The City needs to receive a tree <br />preservation plan that shows the species, size, and location of any and all trees to be saved. <br /> <br />15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.