My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/07/2002
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2002
>
Agenda - Planning Commission - 02/07/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:28:06 AM
Creation date
11/5/2012 11:57:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/07/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The principal structure meets the front yard, rear yard, and side yard setbacks established in the <br />Industrial district. The Industrial district restricts lot coverage to 35%, the site plan is proposing <br />to construct a total of 15,000 square feet of building space on 4.6 acres, which equates to <br />approximately a 7.5% lot coverage. <br /> <br />The site will derive two (2) access points from the extension of 156t~ Avenue. <br /> <br />City Code requires all driveways and off-street parking areas to be paved and finished with B- <br />6/12 concrete curbing. The site plan indicates that the employee/customer parking area and the <br />loading berth area will be surfaced with bituminous pavement. According to the site plan the <br />customer/employee parking area will be finished with concrete curbing and the loading berth <br />area will be absent of the required concrete curbing. The site plan is also indicating an <br />"Unpaved" area that is proposing to be surfaced with gravel and will not be finished with <br />concrete curbing. It is Staff's understanding that the applicant anticipates constructing a future <br />addition within the next 3-Syears that would consist of approximately 25,000-35,000 square feet <br />of office/warehouse space therefore the applicant would like to deviate from the City Code <br />requirement to pave and concrete curb the entire parcel. Deviation from the required bituminous <br />pavement and concrete curbing will require City Council approval. Staff is recommending that <br />the "Unpaved" area identified on the site plan be surfaced with bituminous pavement and <br />finished with concrete curbing. <br /> <br />The proposed development is subject to the review and permitting of the Lower Rum River <br />Watershed Management Organization (WMO). <br /> <br />The exterior building materials for the principal structure are proposing to consist of rock face <br />concrete block with a pre-finished metal coping accent; this meets City Code requirements. <br /> <br />The landscaping plan is acceptable, Staff is requesting that additional tree plantings be included <br />along the east, south and west property lines. <br /> <br />The facility will be served by on-site sewer and water facilities. The City adopted the 2001 <br />Comprehensive Plan on December 18, 2001. The Comprehensive Plan includes a general policy <br />stating that new commercial/industrial developments should be serviced by urban services. <br />Since municipal services are not available to the site, staff is recommending that the <br />development permit require connection to urban services within 2 years of availability. <br /> <br />The Minnesota Department of Transportation has begun a TH 10 Interregional Corridor <br />Management Plan for State Highway. #10. Howard R. Green Company recently made a <br />presentation to the City showing different options for the portion of Highway #10 located in the <br />City of Ramsey. One option includes an expressway that would eventually be converted to a <br />freeway. Another option the City may be presented with is to implement the freeway system <br />without going through the phasing plan of an expressway then converting to a freeway. The <br />exact alignment of the expressway/freeway has not yet been determined, however it would <br />appear that MnDot prefers the northernmost alignment that is immediately adjacent to the BNSF <br />Rail system. The City Council adopted a resolution on January 8, 2002 stating the City's support <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.