Laserfiche WebLink
Based on the previous work completed as part of the overall grading plan and hydrology, and on the modifications <br />to the assumptions for off -site contributions, a new drainage study needs to be completed and presented to the <br />LRRWMO for approval. This study will identify all previous studies and designs, incorporate and document all <br />assumptions, and provide direction as to the requirements for all future sites and public improvements in The COR. <br />This plan will be presented and ultimately approved by the LRRWMO, and will be their basis for their future <br />reviews and approvals. <br />Attached to the case is a proposal for the fees necessary to complete the study and get WMO approval. <br />Recommendation: <br />The development team recommends the HRA authorize the work necessary to complete the proposed stormwater <br />management plan for The COR, and direct the development team to submit the plan for approval to the LRRWMO. <br />Funding Source: <br />HRA Professional Services Budget & City Stormwater Utility Fund <br />Council Action: <br />Approve the proposal to prepare the stormwater management plan for The COR, and submit for approval at the <br />LRRWMO at the next practical meeting. <br />Attachments <br />Fee Proposal <br />Offsite Stormwater Drainage Areas <br />Form Review <br />Inbox Reviewed By Date <br />Hakanson Anderson Engineering Shane Nelson 11/08/2012 10:05 AM <br />Kurt Ulrich Kurt Ulrich 11/08/2012 02:55 PM <br />Form Started By: Darren Lazan Started On: 11/08/2012 08:48 AM <br />Final Approval Date: 11/08/2012 <br />