|
Cost Equlpment
<br />Code
<br />8317 Generator
<br />8318 Generator
<br />8319 Generator
<br />8320 Generator
<br />8321 IGenerator
<br />8755'Golf Cart
<br />8330'Graders
<br />8331 IGraders
<br />8332 !Graders
<br />8350 (Hose, Discharge
<br />8351 !Hose, Discharge
<br />8352 IHose, Discharge
<br />8363 11-lose, Discharge
<br />8354 Hose Discharge
<br />8355 1 ose, Discharge
<br />8356 IHose, Suction
<br />8357 ose, Suction
<br />8358 I ose, Suction
<br />8359 Hose. Suction8360 Hose, Suction
<br />8361 I ose, Suctldn
<br />8517 Jackhammer Dr�yv)
<br />8518 Jackhammer Web'
<br />8380 Loader, Craw er
<br />8381 Loader, Crawler
<br />8382 Loader, Crawler
<br />8383 Loader, Crawler
<br />8384 Loader, Crawler
<br />8540 Loader. Skid -Steer
<br />8541 Loader, Skid -Steer
<br />8542 Loader Skid -Steer
<br />8401 I oaderrractor, Wheel
<br />8390 iLoader, Whee
<br />8391 Loader, Whee
<br />8392'Loader, Whee
<br />8393 !Loader, Whee
<br />8394 !Loader, Whee
<br />8395 Loader, Whee
<br />8396 Loader Whee
<br />8397 Loader, Whee
<br />8398 Loader Whee
<br />8570 Loader-�ackhoe, Wheel
<br />8571 Loader-Backhoe, Wheel
<br />8572. Loader-Backhoe, Wheel
<br />8573Loader-Backhoe Wheel
<br />8410!Mixer, Concrete Portable
<br />8411'Mixer, Concrete Portable
<br />Mixer, Concrete, Trailer
<br />8412 IMntd
<br />cMixer, Concrete, Trailer
<br />8413 Mntd
<br />8076 I otorcvcis, Police
<br />8833 (Mulcher, Trailer Mntd
<br />8634 IMulcher, Trailer Mntd
<br />8635 Mulcher Trailer Mntd
<br />8430 (Paver, Asphalt, Towed
<br />8431 Paver. Asphalt
<br />8432 (Paver, As haft
<br />8433 Paver. As halt
<br />8434 aver. Asphalt
<br />84361
<br />Plck-up, Asphalt
<br />8437 Pick-up, Asphalt
<br />8438 Plck-up. Asphalt
<br />8439 Plck ug, Asphalt
<br />8660 Plow, Cable
<br />FEMA's SCHEDULE OF EQUIPMENT RATES
<br />Specification
<br />Prime Ou ut
<br />Prime Output
<br />Prime Output
<br />'Prime Ou put
<br />Prime Ou,out
<br />(Capacity
<br />Moldboard Size
<br />!Moldboard Size
<br />(Moldboard Size
<br />Diameter
<br />Diameter
<br />Diameter
<br />!Diameter
<br />(Diameter
<br />Diameter
<br />Diameter
<br />Diameter
<br />• Diameter
<br />Diameter
<br />Diameter
<br />Dlameter
<br />Weight Class
<br />Weight Class
<br />Bucket Capacity
<br />Bucket Capacity
<br />Bucket Capacity
<br />Bucket Capacity
<br />'Bucket Capaclty
<br />Operating Capacity
<br />Operating Capaclty
<br />'Operating Capacity
<br />'Bucket Capaclty
<br />!Bucket Capacity
<br />1 Bucket Qapaclty
<br />Bucket Capacity
<br />!Bucket Capacity
<br />Bucket Capacity
<br />Bucket Capacity
<br />I ucket Capacity
<br />113
<br />IBucket Capacity
<br />Loader Bucket Capacity
<br />oader Bucket Capacity
<br />Loader Bucket Capac(((y
<br />Loader Bucket Cagedy
<br />I etching Capacityy
<br />'Belching Capacity
<br />IBatchlna Capacity
<br />IBatchlna Capacity
<br />'Working Capaci
<br />Working Gamic
<br />Working Came tv
<br />Plow Depth
<br />Capacity/Size
<br />350 kW
<br />530 kW
<br />710 kW
<br />1100 kW
<br />2500 kW
<br />2 person
<br />10 ft
<br />12 ft
<br />14ft
<br />3 In
<br />4 in
<br />6In
<br />8 In
<br />12 In
<br />16 In
<br />3 In
<br />4 in
<br />6 In
<br />8 In
<br />12 In
<br />16 In
<br />25-45 lb
<br />30-55 Ib
<br />0,5 cy
<br />1 cv
<br />2 cy
<br />3 cv
<br />4c
<br />1000lb
<br />2000 Ib
<br />3000 Ib
<br />0,5 cv
<br />1 cy.
<br />2 cy
<br />3 cy
<br />4cv•
<br />6 cv
<br />6 cv
<br />cy
<br />cv
<br />0,5 cv
<br />1 cv
<br />1,5 cv
<br />1.75 cy
<br />10 cft
<br />12 cft
<br />11 cft
<br />16 cft
<br />HP Notes
<br />to 500
<br />to 750
<br />to 1000
<br />to 1500
<br />to 3000 I
<br />'I
<br />to 110 'Includes RI Id and
<br />to 150 i Includes Rd and
<br />to 225 !Includes RIpId and
<br />Per 25 foot tennth.
<br />Per 25 foot length,
<br />Per 25 foot length.
<br />Per 25 foot length,
<br />(Per 25 foot length,
<br />Per 25 foot length,
<br />Per 25 foot length.
<br />Per 25 foot length,
<br />Per 25 foot length.
<br />Per 25 foot length.
<br />Per 25 foot length,
<br />Per 25 foot length.
<br />to 32
<br />to 60
<br />to 118
<br />to 178
<br />to 238
<br />to35'
<br />to 65
<br />to 85
<br />to 81
<br />• to 38
<br />to 60
<br />to 105
<br />to 152
<br />to 200
<br />10 260
<br />Includes bucket.
<br />Includes bucket,
<br />includes bucket,
<br />Includes bucket.
<br />Includes bucket.
<br />Unit Rate
<br />hour $95,00
<br />hour $150,00
<br />hour $200.00
<br />I hour $375.00
<br />hour 6500,00
<br />hour $3.20
<br />Articulate hour $34.50
<br />Articulate hour $58.00
<br />Articulate hour $70,00
<br />includes cduglings, hour $0,13
<br />Includes couplings. hour $0.19
<br />Includes couplings. i hour $0.50
<br />Includes couplings, hour $0,75
<br />Includes couplings, (hour $1.35
<br />Includes couplings. I hour $2.20
<br />I/tclu�les couplings. I hour $0.23
<br />Inc udes couplings, I hour $0,43
<br />Includes couplings, I hour $0.90
<br />Includes couplings. hour! $1.35
<br />Includes couplings. hour '$2.45
<br />Includes couplings, hour I $3.90
<br />hourl $1.00
<br />hourl $1.15
<br />hour' $11,50
<br />hour $19.00
<br />flour $42.00
<br />hour $78.00
<br />(flour $116.00
<br />hour $11.00
<br />hour $18.00
<br />hour $22.00
<br />hour $25.00
<br />hour $15.50
<br />hour $21.50
<br />hour $28.76
<br />hour $40.00
<br />hour $62:00
<br />hour $68.00
<br />to 305 hour $82.00
<br />to 360. hour $95.00
<br />to 530 hour $140,00
<br />to 40 Loader and Backhoe Buckets Included, (hour) $14.75
<br />to 70 1.oader and Backhoe Buckets ncluded, hour! $23,50
<br />to 95 Loader and Backhoe Buckets Included. hourI $33.00
<br />to 115 ILoaderand Backhoe Buckets Included. hourl $38.00
<br />•
<br />hour! $3.25
<br />hour $4.25
<br />to 10
<br />to 25
<br />71pph I to 35
<br />10 toh 1 to 55
<br />20 tph to 120 , I hour $24,75
<br />Does not Include Prime Mover, (hour' $7,00
<br />I to 50 Includes wheel and crawler eauipment, .I hour) $85,00
<br />to 125 Includes wheel and crawler eauioment, i hour $115,00
<br />to 175 [Includes wheel and crawler eauipment. I hour' $125,00
<br />I to 250 ' Includes wheel and crawler eauipment, I hour $140.00
<br />to 110 I hour $55,00
<br />to 150 I hour $83,00
<br />1 to 200 I hour $110,00
<br />24 in Ito 30 I ' hour hour $$10,26
<br />hour
<br />$8,75
<br />ihour $15.25
<br />I mile $0,35
<br />I hour $10,25
<br />I hour $16,76
<br />Federal Emergency Management Agenoy Seplmber 16, 2010 Page 4 of 8
<br />P16
<br />
|