Laserfiche WebLink
known as The COR (the "HRA Property") other than tkc Property. Buyer mazi pay-kkc'lkattirg Fees at <br />Jrazirg. E :4, 4 2 Hier awfouil of -the PlattFew on Erki✓t C. but Se11a iz rot rcpres:,rtirrg or vrat antirg the accuracy of E'-ki✓t C and in the event <br />of a conflict between the terms of the City's ordinances and ErkiS t C. Buyer vriR be required to pay all <br />fees due and payable with respect to the Property under the terms of the City's ordinances (the "Platting <br />Fees")_ and that_ in connection with the approval referenced in Section 5.1 above_ Seller has paid such <br />Platting Fees_ including those attributable to the Property_ The Platting Fees attributable to the Property <br />are S39.201.00_ and at Closing_ in addition to the Purchase Price_ Buyer shall pay such amount. <br />5.4 Signage. Attached hereto as Exhibits E-1 and F-1 are drawings showing the locations of <br />the signage to be placed at the entry to the Property and the entry to the Project_ respectively_ Attached <br />hereto as Exhibits E-2 (the "Drive Entry Sign") and F-2 (the "Project Entry Sign") are depictions of <br />the signs to be placed in such locations. Buyer shall pay one third of the cost of construction of the Drive <br />Entry Sian and the incidences thereof including_ without limitation_ landscaping and shall be entitled to <br />the use of one (1) 4 foot by 4 foot panel thereon. Buyer shall pay one third of the cost of construction of <br />the Project Entry Sian and the incidences thereof including._ without limitation_ landscapes and shall be <br />entitled to the use of one (1) 6 foot by 8 foot panel thereon_ which payment shall be made within thirty <br />1301 days after Seller bills Buyer for the cost thereof After construction_ Seller shall maintain the Drive <br />Entry Sian and the Project Entry Sign including the incidences thereto_ but retains the right to include the <br />cost thereof in costs payable by Buyer as owner of Lot 5_ by virtue of the Special Service District for <br />COR TWO_ among other properties_ created by the Ramsey City Council_ The provisions of this Section <br />shall survive the Closing. <br />5.5 Expenses of Buyer. Buyer shall pay all other costs of the development of the <br />Property, including, without limitation, obtaining an approved site plan for the Property, designing the <br />stormwater management and drainage system for the Property; and designing and constructing Buyer's <br />building, parking facilities, sanitary sewer and watermain connections, stormwater management and <br />drainage system, landscaping and related improvements on the Property. <br />ARTICLE 6 <br />DUE DILIGENCE; RIGHT OF ENTRY; CONTINGENCY DATE. <br />6.1 Property Information. Seller shall, within 5 business days after the Effective Date, <br />deliver to Buyer engineering studies, analysis, soil test borings, environmental studies and other <br />documents pertaining to the physical condition, development, and/or operation of the Property in Seller's <br />possession or control, if any (the "Property Information"). Seller makes no representation or warranty <br />to Buyer regarding the truth or accuracy of the information or data contained in the Property Information. <br />6.2 Right of Entry. During period commencing on the Effective Date, through and <br />including the sixtieth (60th) day after the date of this Agreement (the "Contingency DateD, Buyer and its <br />employees, agents and contractors shall have the right to enter the Property during normal business hours <br />and upon reasonable prior notice to Seller to inspect the same, perform surveys, environmental <br />assessments, soil and other tests and for other investigations and activities consistent with the purposes of <br />this Agreement (collectively, the "Inspections"). Notwithstanding the foregoing, Buyer and its <br />employees, agents and independent contractors shall have the right to enter onto the Property after the <br />Contingency Date to show the Property to prospective lenders and others and to inspect the Property, but <br />Buyer shall not conduct any Investigations after the Contingency Date. <br />6.3 Damage. All Inspections shall be conducted at reasonable times in such manner so as to <br />not cause unreasonable interference with the use or occupancy of, or damage to, the Property. Buyer <br />84959-004\ 1571749.doc 4 <br />