Laserfiche WebLink
Public Works Committee 5. 3. <br />Meeting Date: 11/20/2012 <br />By: Shane Nelson, Engineering /Public <br />Works <br />Title: <br />Discuss 2013 Capital Improvement Street Projects <br />Background: <br />The Capital Improvement Program identifies several street projects for 2013. Staff would like to review the <br />scheduled projects with the Public Works Committee and receive direction on how to proceed. The Capital <br />Improvement Program identifies the following projects: <br />Riverdale Drive Extension (Armstrong to Traprock) - The City has received a Co- operative Agreement Grant <br />from Mn /DOT in the amount of $702,000 for this project. In order to receive the grant dollars, the project must be <br />bid and awarded by June 30, 2013. This project will extend sewer from the Riverdale Drive / Armstrong Blvd <br />interesection to the east into the undeveloped property currently owned by Hope Fellowship. It will also extend <br />watermain from the Riverdale Drive / Armstrong Blvd intersection to Ramsey Blvd. The existing street segment of <br />Riverdale Drive will be reconstructed and a new segment across the undeveloped property will be constructed to <br />make a connection with Traprock Street. The existing accesses to Highway 10 at Alpaca Street and Traprock Street <br />will be removed and a new access will be provided at the eastern end of the new Riverdale Drive. Storm water <br />related improvements and mitigation will also be necessary. The total estimated project cost as stated in the CIP is <br />$2,948,000. <br />Riverdale Drive East Reconstruct to Tungsten - This project will reconstruct the existing segment of Riverdale <br />Drive from Highway 10 (Ramsey Blvd) to Tungsten Street. The roadway section is proposed to be narrower, <br />which will provide adequate space for an off - street trail (MRT) to be constructed under a separate contract. <br />Watermain repairs may also be necessary, as the City has experienced two plugs that have failed. The total <br />estimated project cost as stated in the CIP is $1,350,000. <br />Garnet Street Reconstruction - This project will replace the failing pavement on Garnet Street, a local residential <br />street. We understand that this project has been discussed on several occasions and may present some challenges in <br />regards to the sewer and water extensions and City policy for reconstruction projects. The total estimated project <br />cost as stated in the CIP is $300,000, however, based on the extent of soil corrections that may be necessary this <br />estimate may be understated. <br />Zeolite Street - This project will construct the permanent section of Zeolite Street in the COR. The total estimated <br />cost as stated in the CIP is $400,000. <br />Annual Street Reconstruction Program - This project consists of regularly scheduled maintenance of paved <br />streets (i.e. seal coating, crack filling, patching). The total estimated cost as stated in the CIP is $530,000. <br />