My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/20/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 11/20/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:32:00 AM
Creation date
11/21/2012 10:48:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2013 thru 2017 <br />Department <br />City of Ramsey, Minnesota Contact <br />Project # 12 -STR -008 <br />Project Name <br />Reconstruct Riverdale Drive to Tungston Street <br />Description <br />This project would reconstruct Riverdale Drive to Tungston Street <br />Justification <br />This project will reconstruct Riverdale Drive, grading the shoulder for a 10 foot bituminous trail which is part of the Mississippi River Trail grant' <br />from the National Park Service. This project as scoped removes all bituminous and curb. Storm sewer will be installed to meet MSA spacing <br />guidelines. The curb will be replaced and new bituminous will be installed. This is an MSA route. <br />The roadway is scoped at two 12 foot driving lanes and two eight foot parking lanes. There could be cost savings through retaining the curb on one <br />side of the road, installed one 8 foot parking lane and replacing curb. <br />Revised 10/2012 <br />Expenditures <br />Improvements Other than Build <br />Funding Sources <br />MSA <br />Public Improvement Revolving <br />Tax Increment Fund #4 <br />Total 1,350,000 <br />Total 1,350,000 <br />Type <br />Useful Life <br />Category <br />Priority <br />Status <br />Total Project Cost: <br />Street Improvements <br />Improvement <br />25 <br />Street Improvement <br />6- Planned <br />Active <br />$1,350,000 <br />2013 2014 2015 2016 2017 Total <br />1,350,000 1,350,000 <br />1,350,000 <br />2013 2014 2015 2016 2017 Total <br />237,938 237,938 <br />837,062 837,062 <br />275,000 275,000 <br />1,350,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.