Laserfiche WebLink
Cost <br />Code <br />Equipment <br />Specification <br />Capacity /Size <br />HP <br />Notes <br />Unit <br />Rate <br />8490 <br />8491 <br />8492 <br />8493 <br />8494 <br />8486 <br />Aerial Lift, Self- Propelled <br />Aerial Lift, Self - Propelled <br />Aerial Lift, Self - Propelled <br />Aerial Lift, Self - Propelled <br />Aerial Lift, Self- Propelled <br />Aerial Lift, Truck Mntd <br />Max, Platform Height <br />Max. Platform Height <br />Max, Platform Height <br />Max. Platform Height <br />Max. Platform Height <br />Max. Platform Height <br />37 ft <br />'60 ft <br />70 ft <br />125 ft <br />. 150 ft <br />40 ft <br />to 15 <br />to 30 <br />to 50 <br />to 85 <br />to 130 <br />Articulated, Telescoping, Scissor. <br />Articulated, Telescoping, Scissor. <br />Articulated, Telescoping, Scissor. <br />Articulated and Telescoping. ' <br />Articulated and Telescoping, <br />Articulated and Telescoping. Add to <br />Truck rate for total rate. <br />hour <br />hour <br />hour <br />hour <br />hour <br />hour <br />$6,25 <br />$12.25 <br />$21.00 <br />$55,00 <br />$67.00 <br />$6.75 <br />8487 <br />Aerial Lift Truck Mntd <br />Max, Platform Height <br />81 It <br />Articulated and Telescoping. Add to <br />Truck rate for total rate, <br />hour <br />$12.25 <br />8488 <br />Aerial Lift, Truck Mntd <br />Max. Platform Height <br />80 ft <br />Articulated and Telescoping. Add to <br />Truck rate for total rate. <br />. <br />hour <br />$23,50 <br />8489 <br />Aerial Lift, Truck Mntd <br />• <br />Max, Platform Height <br />'100 ft <br />Articulated and Telescoping. Add to <br />Truck rate for total rate. .hour <br />$34.00 <br />8010 <br />Alr Compressor <br />Alr Delivery <br />41 cfm <br />to 10 <br />Hoses included. <br />hour <br />51.50 <br />8011 <br />Air Compressor <br />Air Delivery <br />103 cfm <br />to 30 <br />Hoses Included. <br />hour <br />$7.00 <br />8012 <br />Air Compressor <br />Air Delivery <br />130 cfm <br />to 60 <br />Hoses included. <br />hour <br />$9. <br />8013 <br />Air Compressor <br />Air Delivery <br />175 cfm <br />to 90 <br />Hoses Included. <br />hour <br />$20.00 <br />8014 <br />Air Compressor <br />Alr Delivery <br />400 cfm <br />to 145 <br />Hoses Included. <br />hour <br />$27.50 <br />8015 <br />Air Compressor <br />Air Delivery <br />575 cfm <br />to 230 <br />Hoses Included. <br />hour <br />$45.50 <br />8016 <br />Air Compressor <br />Air Delivery <br />1100 cfm <br />to 365 <br />Hoses Included, <br />hour <br />561.00 <br />8017 <br />Alr Compressor <br />Air Delivery <br />1600 cfm <br />to 560 <br />Hoses Included. <br />hour <br />580.00 <br />8040 <br />Ambulance <br />to 150 <br />• <br />hour <br />$25.50 <br />8041 <br />Ambulance <br />to 210 <br />hour <br />$32.50 <br />8060 <br />Auger; Pprtable <br />Hole Diameter <br />16 In <br />to 6 <br />hour <br />$1. 30 <br />8061 <br />Auer Portable <br />Hole Diameter <br />18 In <br />to 13 <br />hour <br />$3,50 <br />8062 <br />Auer Tractor Mntd <br />Max. Au.'er Diameter <br />36 In <br />to 13 <br />Includes digger, boom and mounting <br />hardware. Add to Tractor rate for total <br />rate. <br />hour <br />$1, 30 <br />8063 <br />Auger, Truck Mntd <br />Max. Auger Size <br />24 In <br />to 100 <br />Includes digger, boom and mounting <br />hardware. Add to Truck rate for total <br />rate. <br />hour <br />$29,00 <br />50,50 <br />$13.00 <br />$0.60 <br />516,25 <br />8070 <br />Automobile <br />to 130 <br />to 1.30 <br />to 250 <br />to 250 <br />Transporting people. <br />Transporting cargo, <br />mile <br />hour <br />mile <br />hour <br />8071 <br />8072 <br />8073 <br />Automobile <br />Automobile, Police <br />Automobile Police <br />Patrolling. • <br />Stallone with en Ina running. <br />8110 <br />Barge, Deck <br />Size • <br />50'x35'x7.25' <br />hour <br />$34,00 <br />549.00 <br />8111 <br />Barge, Deck <br />Size <br />, 50'x36'x9' <br />hour <br />8112 <br />Barge, Deck <br />Size <br />120'x45'x10' <br />hour <br />$60,00 <br />$75,00 <br />53,16 <br />$8,50 <br />5150.00 <br />$200,00 <br />$250,00 <br />$300.00 <br />8113 <br />8050 <br />8051 <br />8133 <br />8134 <br />8135 <br />8136 <br />Barge Deck <br />Size <br />160'x45'x11'. <br />to 8 <br />to 5 <br />to 435 <br />to 525 <br />to 705 <br />to 870 <br />hour <br />hour <br />hour <br />hour <br />hour <br />hour <br />hour <br />Board Arrow <br />Board, Message <br />Boat Push <br />Boat, Push <br />Boat Push <br />Size <br />45'x21'x6' <br />Trailer Mounted, <br />Trailer Mounted. <br />Fiat hull. <br />Size <br />Size <br />54'x21'x6' <br />58'x24'x7.5' <br />Flat hull. <br />Flat hull. <br />Boat, Push <br />Size <br />64'x25'x8' <br />Flat hull. <br />DEPARTMENT OF HOMELAND SECURITY <br />FEDERAL EMERGENCY MANAGEMENT AGENCY <br />RECOVERY DIRECTORATE <br />PUBLIC ASSISTANCE DIVISION <br />WASHINGTON, D.C. 20472 <br />The rates on this Schedule of Equipment Rates are for applicant -owned equipment In good mechanical condition, <br />complete with all required attachments. Each rate covers all costs eligible under the Robert T. Stafford Disaster Relief <br />and Emergency Assistance Act, 42 U.S.C. § 6121, et seq„ for ownership and operation of equipment, including <br />depreciation, overhead, all maintenance, field repairs, fuel, lubricants, tires, OSHA equipment and other costs Incidental <br />to operation. Standby equipment costs are not eligible, <br />Equipment must be In actual operation performing eligible work In order for reimbursement to be eligible, LABOR COSTS <br />OF OPERATOR ARE NOT INCLUDED In the rates and should be approved separately from equipment costs. <br />Information regarding the use of the Schedule Is contained In 44 CFR § 206.228 Allowable Costs. Rates for equipment <br />not listed will be furnished by FEMA upon request. Any appeals shall be In accordance with 44 CFR § 206.206 Appeals. <br />THESE RATES ARE APPLICABLE TO MAJOR DISASTERS AND EMERGENCIES DECLARED BY THE PRESIDENT <br />BE R 15, 2010. <br />FEMA's SCHEDULE OF EQUIPMENT RATES <br />Federal Emergency Management Agency <br />Septmber 16, 2010 <br />Page 1 of <br />P13 <br />