Laserfiche WebLink
H <br />N Z <br />a) a <br />rn H H o <br />co J (n O <br />a Dp ci <br />d <br />z <br />WORK BREAKDOWN STRUCTURE <br />O <br />CITY OF RAMSEY <br />PROJECT: RIVERDALE DRIVE EXTENSION, CITY PROJECT 12-22 <br />ESTIMATED PERSON HOURS <br />0 <br />U <br />U W <br />M Q V CO N CO ll • ll • UCO <br />O) co O co ▪ co .▪ - CO M <br />J H M r- <br />H <br />O <br />H <br />W <br />H <br />ce <br />H 0 <br />co <br />z <br />0 <br />z <br />W • = N <br />LL.IZ V CO CO V V V M <br />• H <br />Z <br />W <br />0 <br />Z_ <br />E <br />w U v co co v v v co <br />z w <br />O H <br />z <br />w <br />ce <br />0 <br />w <br />C.) Q (.0 co (.0O 0 V N V N ON V CO N <br />ce <br />0 <br />ce <br />Z <br />00 W <br />W CT)Z CO N (O CO CO 0 N 0 (O CO V C., w M <br />0 Z <br />W <br />ce <br />W <br />} W W 0 <br />o-Oz <br />z O 2 <br />w <br />WORK TASK DESCRIPTION <br />Intermediate Design; Dec 17 - Feb 22; 10 weeks <br />V V N V N N CO N <br />Removal Plan <br />Pavement Design / ESAL Forecasting <br />Vertical Design (3rd and final runs) <br />Cross Sections <br />Detailed Sanitary Sewer Design <br />Detailed Watermain Design <br />Stormwater Hydrologic Model <br />O <br />M <br />V V N N O <br />is <br />Stakeholder Review <br />0 <br />z <br />• Q. N co. V in. (O I- co O) O— <br />• M M M (( C) (( (( (( CO CO (M (M - (M (M (M (M <br />H <br />SUBTOTAL - TASK 3 <br />Riverdale Drive Work Hour Estimate <br />