Laserfiche WebLink
after consultation with the City Engineer. In the event the PERMITTEE fails to construct and <br />install the Required Improvements as required herein, the City Council may order the completion of <br />the Required Improvements with CITY day labor and/or by letting contracts for said completion and <br />draw upon the escrow for payment. Only the City Council shall have the authority to direct <br />completion of the Required Improvements and withdraw from the escrow account. The <br />PERMITTEE hereby grants permission and a license to the CITY and/or its contractors and assigns <br />to enter upon the Subject Property for the purpose of completing the construction and installation of <br />the Required Improvements in the event of the PERMITTEE' s default. <br />10. Inspection Fees. The PERMITTEE shall be responsible for all inspection costs incurred by the <br />CITY related to the installation of Required Improvements. The PERMITTEE shall make a cash <br />deposit into the appropriate escrow account at the CITY and the CITY shall have the authority to <br />draw upon these funds for the purpose of compensating for inspection services. The amount of the <br />deposit shall be equal to five percent (5%) of the estimated cost of the Required Improvements, <br />which equates to Dollars and No Cents ($ .00) (5% x $ .00). <br />Upon completion of the Improvements to the satisfaction of the City, any surplus balance remaining <br />in the CITY's escrow account shall be refunded to the PERMITTEE. <br />SECTION II <br />PERMITS AND OCCUPANCY <br />11. Requirements for Building Permits. No building permit for any lot in the Plat shall be issued <br />until: (a) a Class 5 driving surface is installed to within 300 feet of the structure; (b) site plan <br />approval is granted by the CITY and any expense incurred in giving site plan approval has been <br />reimbursed to the CITY; (c) the Building Official has been provided with a copy of the approved <br />site plan, signed by a registered architect or surveyor, showing all dimensions to scale; (d) the Plat <br />has been recorded at Anoka County Property Records, (e) a Lower Rum River Watershed <br />Management Organization Permit has been obtained. The CITY reserves the right to suspend all <br />building activities upon the CITY being notified by an outside agency that the appropriate permit(s) <br />was not obtained from the applicable agency. Approval of the building foundation requires a <br />certificate of elevation signed by a licensed (State of Minnesota), professional land surveyor, <br />verifying that the elevation is in accordance with the approved grading plan for the Plat. Foundation <br />approvals will require a certificate of elevation verifying that the actual elevation is in compliance <br />with the approved grading and drainage plan. The lowest floor elevation shall be at least two (2) feet <br />above the 100 year elevation. <br />No occupancy permit for any lot in the Plat shall be issued until: (a) vehicular access to the lot is <br />provided including the installation of at least one layer of bituminous surfacing; (b) all utilities are <br />in place, operational and accepted by the CITY; (c) for lots that have a slope of less than 2%, a <br />certificate of grading, prepared by a licensed (State of Minnesota), professional land surveyor, must <br />be provided to the CITY documenting that the flattest grade on this lot is 1% or greater will require <br />certificates of grading. <br />SECTION IV <br />LANDSCAPING <br />12. Maintenance Guarantee for Landscaping. It is herein agreed that the PERMITTEE shall provide <br />a maintenance guarantee to ensure the survival of the plantings. Said maintenance guarantee shall <br />consist of cash or a letter of credit, approved as to form by the CITY, in the amount of <br />and No Cents ($XXXX.00) [# plantings (XX trees, XX shrubs) x <br />McDonald's <br />Development Permit <br />Page 3 of 6 <br />