Laserfiche WebLink
CITY OF RAMSEY <br />2013 ADOPTED SCHEDULE OF RATES, FEES AND CHARGES <br />Adopted November 27, 2012 <br />SERVICE OR LICENSE <br />SPECIAL NOTES <br />2013 <br />Adopted <br />Culverts <br />Price + Tax <br />Street Swee in : Onl : <br />Per FEMA Schedule of Equipment Rates <br />74.00/Hr <br />.Equipment <br />� <br />r47 1 iii iiii ::: iiiiiiiiiii:: iiiii iiiiiiiii :i:::iiiiiiiiiiiiiiiiiiiiiiii: iii :iiiii::i:::i:iiiiiiiiiiiiiiii <br />Cigarette Sales (vending and over -the counter) • <br />250.00 <br />Cigarette Sales with age verification technology <br />150.00 <br />UTILITY RATES <br />Assessment Charge for Unpaid Items Assessed <br />Administration fee <br />- $76 /ACCT • <br />Interest Rate on Unpaid Items Assessed <br />2 basis points over 10 -year treasury <br />Penalty/late <br />Past due on current billing <br />10% <br />payment <br />¢ I " .AiRi E2iii iii E aia i iii iiii E i iiiIiiiii:Iii:iiiiiii:Miiii <br />(Residential <br />Curb -side Program fee /qtr <br />Per Ace Contract <br />8.85 /qtr <br />.t3'4i' : i ii i iiiiiii iiiiii '•iiEii° 'a '•E'•iaii ii`• ` '•a'E <br />Residential/Single dwelling usage fee /qtr <br />Per 2012 Comprehensive Water System Study <br />66.79 <br />Multi - family(apt) & commercial usage fee /qtr <br />66.79 +2.89 /1000 gal. <br />in excess of 20,000 gal. <br />Connection charge /res. equivalent <br />Per 2012 Comprehensive Water System Study <br />1,099.00 <br />Connection charge /acre comm. /ind. <br />Per 2012 Comprehensive Water System Study <br />3,308.00 <br />Lateral Benefit Charges <br />Per 2012 Comprehensive Water System Study <br />3,328.00 <br />:i•::• ............ <br />Siiee�X+ k�tsiiiiii :i:i:i:iii:i:i:i ?iiiii:i:`:i ii:iEii3 ?E ii: iiisiiiiiE; EEiiiiiiiiiiiiiifiiE:iiiEiEEiiE <br />Developer contribution: <br />' installation of Cobra street light <br />1300.00/light <br />traditionaire subdivision street light (w /100 ft of wire) <br />Developer Installed <br />New ROW COR Lights <br />52,600/light <br />street light 0 & M 3 year Q $98 /year <br />$294/light <br />Residential billing: <br />urban subdivision street light rate per lot ( >7/92) <br />9.01 /qtr <br />niral subdivision street light rate . er lot <br />14.85/. tr <br />priority street light rate per residential lot <br />1.37 /qtr <br />Bre tnWai6tiiNivaae unit. e : i iiiiiiiii` ii ': ii ii i i ii iii €i <br />Residential <br />10.03 /qtr <br />Commercial <br />Based Upon Engineers Calculations <br />40.12/REU /qtr <br />Trunk charge /res. equivalent <br />448.00 <br />Tnudr charge /acre comm. /ind. <br />4,465.00 <br />e <br />it< t. iAi:tq�iiiiiii'iiiii?a•. 2aiiiiaiiiiiiiEiii2`'Eiiiii iii :iii:::::iEii ii•iii i i i ii ii i i i:E iii <br />Per 2012 Comprehensive Water System Study <br />35.70 <br />Minimum usage fee /qtr <br />Quarterly Rate Structure <br />Conservation Rates <br />52.38 per 1,000 for 1st 15,000 gallons <br />$2.47 per 1,000 for 15,001- 25,000 <br />$2.55 per 1,000 for 25,001- 40,000 <br />$2.70 per 1,000 for 40,001- 60,000 <br />$2.91 per 1,000 for 60,001- 99,000 <br />53.22 per 1,000 for 99,001- 201,000 <br />$3.85 per 1,000 for 201,001 and above <br />• <br />Odd/Even Sprinkling Violations: • • <br />Effective day after Memorial Day thnu Day after Labor Day • <br />No Sprinkling between 10 am -8:00 pm <br />First Violation <br />Written Warning & Registered Letter <br />Second Violation - <br />50.00 <br />Third Violation <br />100,00 <br />Fourth Violation <br />Water Service turned off <br />Meter Replacement Admin Fee for Non - Compliance <br />$75 /qtr <br />Installation of meter iv /remote (Res & Commnercial) <br />140.00 <br />Curb Stop driveway enclosure . <br />65.00 <br />5/8" Meter - Radio Read System <br />275.00 <br />Replacement Meter Horn <br />45.00 <br />CITY OF RAMSEY <br />2013 ADOPTED SCHEDULE OF RATES, FEES AND CHARGES <br />Adopted November 27, 2012 <br />