My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 01/08/2013
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2013
>
Agenda - Council Work Session - 01/08/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:03:00 AM
Creation date
1/10/2013 1:37:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
01/08/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br />The purpose of this feasibility report is to provide the City of Ramsey with a preliminary <br />examination of the improvements proposed with the Riverdale Drive project. This report was <br />ordered by the City Council at a regular City Council meeting. <br />Riverdale Drive is a collector street that runs in an east /west direction parallel to Trunk Highway <br />10. The segments studied in this report include the reconstruction of the existing portion of <br />Riverdale Drive from Armstrong Boulevard to just east of Alpaca Street and the extension of <br />Riverdale Drive from just east of Alpaca Street to Traprock Street. Access to TH10 at Alpaca <br />Street will be eliminated and the access at Traprock Street will be reconfigured to three - <br />quarter's access. Completing this project continues to move the City forward in realizing its <br />goal of obtaining an interchange at the intersection of Armstrong Boulevard with Highway 10. <br />The future interchange layout concept is shown on Figure 1. <br />Figure 1. Future Interchange Layout Concept. <br />Consistent with the City's Comprehensive Sanitary Sewer Study and Comprehensive Water <br />Study, it is proposed the sanitary sewer and watermain are also extended under the current <br />alignment of Riverdale Drive. Under the new alignment of Riverdale Drive, it is proposed that <br />watermain is extended easterly to Traprock Street. The extension of sanitary sewer and water <br />utilities are discussed in greater detail in subsequent sections of this report. The project area <br />and roadway location for this project are shown on Figure 2. <br />11 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.