Laserfiche WebLink
Address <br />8000 Highway10 NW <br />7955 Riverdale Drive <br />7945 Riverdale Drive <br />7815 Riverdale Drive <br />7103 Riverdale. Drive <br />Owner <br />Premier Armstrong LLC <br />TIRAED LLC <br />Pearson Investments LLC <br />DSB Ventures LLC <br />Pearson Investments LLC <br />Area of Lot (ac) <br />1.11 <br />1.23 <br />4.57 <br />2.38 <br />6.84 <br />Water Availibility Charge($1,148 /Ea) <br />$1,148.00 <br />$1,148.00 <br />$1,148.00 <br />$1,148.00 <br />$1,148.00 <br />Connection Charge {$5,835 /ac) <br />$6,476.85 <br />57,177.05 <br />$26,665.95 <br />$13,887.30 <br />$39,911.40 <br />Lateral Benefit Charge ($6,143/ac) <br />$6,818.73 <br />$7,555.89 <br />$28,073.51 <br />$14,620.34 <br />$42,018.12 <br />Address <br />7850 Riverdale Drive <br />7820 Riverdale Drive <br />Vacant, unassigned <br />7550 Highway 10 NW <br />Total <br />Owner <br />The Bank of Elk River <br />Jesse Ternus <br />Brad Fitch <br />Hope Fellowship of <br />Ramsey Inc <br />2 -01 LLC <br />Area of Lot (ac) <br />1.53 <br />1.6 <br />29.24 <br />15.44 <br />63.94 <br />Water Availibility Charge 91,148/En) <br />$1,148.00 <br />$1,148.00 <br />$1,148.00 <br />$1,148.00 <br />$10,332.00 <br />Connection Charge($5,835 /ac) <br />$8,927.55 <br />$9,336.00 <br />$170,615.40 <br />$51,075.52 <br />$334,073.02 <br />Lateral Benefit Charge ($6,143/ac) <br />$9,398.79 <br />$9,828.80 <br />$179,621:32 <br />$94,847.92 <br />$297,935.50 <br />collected is necessary to fund the other trunk improvements that are not proposed to be <br />constructed with this project but are necessary for the existing and ultimate system (i.e. off -site <br />trunk sewer mains, lift stations, forcemains, etc). <br />Connection Charges — Water <br />The City's schedule of rates and charges currently specifies Water Availability Charges (WAC) <br />and connection fees for trunk water facilities (connection charge) and lateral water facilities <br />(lateral benefit charge) which would be preferable for recapturing the capital investment. <br />According to the adopted 2013 schedule of rates and charges, the above - mentioned fees are as <br />follows: <br />Water Charges <br />Water Availability Charge (WAC) $1,148 per address <br />Water Connection Charge (Commercial / Industrial) $5,835 per acre <br />Water Lateral Benefit Charge $6,143 per acre <br />A preliminary examination of the land area of the adjacent properties has been completed <br />utilizing Geographic Information Systems (GIS) and preliminary estimates of the revenue <br />collected at the time of connection are presented below in Table 4. <br />Table 4. Estimated Water Main Connection Charge Revenue. <br />Totals <br />$632,008.52 <br />As can been seen in Table 4 above, the anticipated revenue ultimately collected for the Water <br />System improvements is estimated to be $632,008, which is greater than the estimated <br />expenditures for this project currently estimated at $521,000. However, the additional revenue <br />101 Page <br />