Laserfiche WebLink
MATCH CONTRIBUTIONS <br />Installation Labor Estimates: <br />• Course Design: 60 hours (estimated) <br />• Baskets: 4 hours each (estimated): <br />• Tee Pads: 8 hours each (estimated): <br />• Signage: 1 hour each (estimated): <br />• Fairway clearing: $200 each (estimated) <br />• Total Installation Labor Hours: <br />Installation Labor Estimates Costs: <br />• 60 hrs. <br />• 4 hrs. x 18 =72 hrs. <br />• 8 hrs. x 18 =144 hrs. <br />• 1hrs. x 18 = 18 hrs. <br />• 294 hrs. x $8 per hour = $2,352.00 <br />• $200 x 18 = $3600 <br />• $5,952 <br />Summary Totals: <br />TOTAL ESTIMATED VALUE OF MATCH CONTRIBUTIONS <br />• <br />S5,952.00 <br />5,952.00 <br />