Laserfiche WebLink
Review File: Seasons of Ramsey <br />Preliminary Plat Review -Planning Division <br />January 25, 2013 <br />Page 6 of 7 <br />Mailbox Location: The placement of mailboxes for the townhome units should be located along the <br />private streets when possible. Location of mailboxes along public streets will need to be clustered and is <br />subject to the review and approval of the Streets Supervisor. <br />Address Signage: The City will be requiring an address location sign (specifying the units addresses) to <br />be placed at the entrance of all private streets. The required signage will assist emergency services in <br />locating a specific unit when called to the site. In order to assist Staff in review of the placement of signs <br />and to ensure an orderly look of the site, please revise the signage and striping plan to show address signs. <br />The address signage is subject to the review and approval of the City Engineer and Police Chief. It <br />should be noted that signs identifying the development will require a separate sign permit. <br />Financial Surety for Required Improvements. A Financial Surety shall be required to ensure the timely <br />completion of all Required Improvements. The Surety shall be in the form of Letter of Credit or Cash <br />Escrow. A sample Letter of Credit was included in your application packet. The Letter of Credit must be <br />reviewed and approved to as form by the City's Finance Director prior to releasing the Plat for recording. <br />A surety in the amount of 125% the cost of Stage I and Stage II Improvements, as defined in City Code <br />Section 117-615, shall be collected. A surety in the amount of 150% the cost of improvements required <br />by the City's Zoning Code shall be collected, unless otherwise required for issuance of a Certificate of <br />Occupancy. <br />Engineering Inspection Fees. The Stage I and Stage II Improvements are proposed to be constructed by <br />the Developer, without City participation or construction. It will be necessary for the City to inspect the <br />Stage I and Stage II Improvements to ensure their proper installation. Stage I and Stage II Improvements <br />that will be inspected in the proposed project include, but are not limited to: <br />1. The extension of 147th Lane NW, <br />2. The installation of lateral sanitary sewer and municipal water lines in 147th Lane NW, <br />3. The installation of lateral sanitary sewer and municipal water lines in the extended private road <br />(extension from 147th Circle NW), <br />4. The installation of private services to the property line from the lateral lines <br />5. Stormwater facilities <br />Development Agreement. You shall be required to enter into a Development Agreement with the City <br />outlining the terms above related to approval and recording of the Plat. A preliminary draft has been <br />submitted for your review. This is a preliminary draft, and the final draft will be made available prior to <br />City Council review, scheduled for February 12th, 2013. Please note that this time is tentative. <br />A meeting between the City and Developer has been scheduled for Friday, January 25, 2013. However, <br />the terms of that discussion are not available in time for preparation of this report. Staff will provide a <br />verbal update to the Planning Commission on January 31St. The Development Agreement will be <br />considered for approval by the City Council. <br />Development Permit. You shall be required to enter into a Development Permit with the City outlining <br />the terms above related to site plan approval, which is essentially the private improvements. <br />Easement Vacation. The City Council introduced an Ordinance on January 22nd, 2013 to vacate drainage <br />and utility easements as well as right of way for 142nd Circle NW, as requested. Final approval will be <br />considered on February 12th, and will include a Public Hearing. <br />