Laserfiche WebLink
Category <br />Water Utility Improvement <br />WM Looping: Alpine Dr. (CSAH 5 to Krypton St.) <br />Renovate Pump House 2 <br />Complete Pump House 3 <br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd) <br />Water Treatment Plant Construction <br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd) <br />1.5 MG Ground Storage Reservoir <br />Well Rehabilitation & Pump Replacement <br />River Pines Lift Station Water Connection <br />Fire Station #1 Extension of Water <br />Watermain Sunfish Lk Blvd <br />Water Utility Improvement Total <br />GRAND TOTAL <br />City of Ramsey, Minnesota <br />Capital Improvement Program <br />2013 thru 2017 <br />PROJECTS BY CATEGORY <br />Project# Priority 2013 2014 2015 2016 2017 Total <br />04-WTR-001 6 <br />04-WTR-004 5 <br />04-WTR-005 6 <br />04-WTR-009 6 <br />04-WTR-017 6 <br />04-WTR-018 6 <br />05-WTR-004 6 <br />07-WTR-001 6 <br />08-WTR-003 6 <br />11-WTR-003 6 <br />12-WTR-001 6 <br />100,000 100,000 <br />49,000 49,000 <br />60,000 60,000 <br />225,000 225,000 <br />9,700,000 8,700,000 18,400,000 <br />521,000 521,000 <br />2,000,000 2,000,000 <br />58,000 30,000 32,000 35,000 38,000 193,000 <br />20,000 20,000 <br />25,000 25,000 <br />350,000 350,000 <br />579,000 380,000 2,032,000 10,085,000 8,867,000 21,943,000 <br />579,000 380,000 2,032,000 10,085,000 8,867,000 21,943,000 <br />Revised 10/2012 <br />PAGE 273 <br />