My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/12/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 02/12/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:06:34 AM
Creation date
2/13/2013 1:02:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/12/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As part of the proposed development, a critical east -west connection of 147th Lane NW is created and constructed <br />by the Developer; a proposal that the City previously recommended with the TOWN CENTER GARDENS Plat. <br />The net result is that the existing circle, or loop, is no longer necessary. The existing 147th Lane will no longer <br />terminate before connecting to another public street. As such, 147th Circle NW is proposed to be vacated, and <br />converted to a private street. This connection provides necessary connectivity between Town Center Gardens and <br />The COR. Said connection should improve safety and mobility for the entire area north of Bunker Lake Boulevard. <br />A drainage and utility easement shall still be necessary for the public infrastructure in this location (sanitary sewer <br />and municipal water lateral lines). <br />The design of the private roadway on the western edge of the development has some tight turning radii. The <br />Developer has provided verification in the form of a turning exhibit to ensure public safety apparatuses have <br />adequate turning movements. <br />Grading, Drainage, and Utility Plans are generally acceptable, with amendments outlined in the Staff Review File. <br />It is hereby re -enforced that individual services will be provided to each unit, rather than a single service for each <br />building. Final plans are currently being reviewed as to compliance with the initial review letter. <br />The Landscaping Plan is generally acceptable, with amendments outlined in the Staff Review File. Staff would like <br />to call out the topsoil requirements, as noted in the Sketch Plan Review File, to ensure that the Developer fully <br />understands said requirements. <br />As it relates to development fees, the number of units previously platted exceeds the number of units proposed in <br />the new plat. The original plat created fifty-two (52) units within the same geographic area as the proposed Plat. <br />The SEASONS OF RAMSEY Plat proposes fifty (50) units. Staff has calculated all development fees using the fee <br />schedule established by ordinance for 2013. It is important to note that Staff is using evidence of actual payment <br />being made as basis for the following calculation. This is important to note to establish a finding that development <br />fees are not being reduced. Staff is applying full payment of required development fees. The result of the analysis <br />indicates 'credits' being made available for sanitary sewer trunk, water trunk, and stormwater management. <br />However, additional fees are due for Park Dedication and Trail Development. The credits will be applied to the fees <br />due on these two accounts. <br />The Developer has been successful in acquiring financing from the Minnesota Housing Finance Agency (MHFA) <br />from the Section 42 Tax Credit account. As part of that financing, the Developer received points for local <br />contribution. The City Council previously agreed in concept for a land donation in the form of vacated right of way <br />(previously mentioned) and conveyance of a small, remnant parcel currently owned by the City of Ramsey Housing <br />and Redevelopment Authority (HRA). This remnant parcel does not have development potential on its own, and <br />the only logical use is to combine with this proposed development. The HRA adopted a resolution on January 22nd, <br />2013 to convey Outlot C, RAMSEY TOWN CENTER 8TH ADDITION to The Seasons of Ramsey Limited <br />Partnership. In addition, the City Council introduced an ordinance on January 22nd, 2013 to vacate drainage and <br />utility easements as well as right of way for 147th Circle NW. <br />The City has sent the Application to the Anoka County Highway Department for review and comment, as the <br />proposed development is located adjacent to a County -State Aid Highway (Bunker Lake Boulevard [CSAH 116]). <br />Staff is currently awaiting a response. However, Anoka County did comment on the COR TWO/North Commons <br />Plat in regards to improvements to Bunker Lake Boulevard required of the Alternative Urbanwide Area Review <br />(AUAR) and Joint Powers Agreement (JPA) with Anoka County. Each project that is approved by the City adds <br />additional volume to Bunker Lake Boulevard. This project is included in the City's five-year Capital Improvement <br />Program (CIP). The CIP is a financial planning document and does not give approval to requested projects. The <br />Bunker Lake Boulevard project is proposed to be funded by Tax Increment Financing (TIF) District #14. However, <br />there is not sufficient increment created to commence the project at this time. This is not necessarily directly related <br />to the Zoning Code review, still an important note for future planning and project viability. Staff has forwarded the <br />tentative project timeline and funding to Anoka County. In addition, Staff noted that the project is actually a <br />reduction in number of units from previous approvals. <br />On February 1st, 2013, legal counsel from 21st Century Bank (current Property Owner) expressed concern over the <br />
The URL can be used to link to this page
Your browser does not support the video tag.