Laserfiche WebLink
No hauling shall be allowed on any residential streets. Only <br />State, County or Municipal State Aid Streets constructed to 9 ton <br />standards shall be used as haul roads. <br /> <br />No build up of material shall be permitted and in' the event that <br />build up does occur, the property owner will be responsible for <br />any costs incurred in removal of the same. <br /> <br />Dust created by travel on the access road shall be controlled by <br />appropriate means by the property owner. If it is not possible to <br />control the dust on any given day, the extraction operation shall <br />cease on that day. If, in the opinion of the City Engineer, the <br />dust created by the operation is excessive, the operation shall <br />cease until the dust problem is abated. <br /> <br />In order to prevent excessive dust pollution,-the extraction <br />operation shall discontinue at any time when wind gusts are in <br />excess of 30 miles per hour. <br /> <br />10. A performance bond in the amount of $7,500.00 per five acres of <br /> property shall be filed with the City to cover any screening, <br /> buffer and turf establishment and costs incurred in '~he <br /> restoration plan. This bond shall be kept current until final <br /> completion of the grading and excavating operation. <br /> <br />11. The property owner shall be responsible for all expenses incurred <br /> by the City in the administration of this Conditional use permit. <br /> <br />4 <br /> <br /> <br />