My WebLink
|
Help
|
About
|
Sign Out
Home
10/16/90 Special
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1990
>
10/16/90 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:06:49 AM
Creation date
11/13/2003 11:59:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission - Special
Document Date
10/16/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23. <br /> <br />24. <br /> <br />25. <br /> <br />26. <br /> <br />27. <br /> <br />28. <br /> <br />29° <br /> <br />Screening. The .Permit Holder agrees to screen the aluminum <br />processing facility from any public street. The Permit Holder <br />shall submit a screening and landscape plan to the City <br />Engineer for approval prior to commencing processing <br />operations. Such screening shall be achieved using grading, <br />landscape elements, and/or plant materials which will achieve <br />up to 90% opacity. Supplemental screening of the Site may be <br />ordered by the City to comply with the then current screening <br />requirements for outside storage on industrial property. <br /> <br />Off-Street Parking. Off-street parking shall be provided such <br />that there is at least one parking space for each employee on <br />the maximum working shift plus three spaces for visitor <br />parking. <br /> <br />Surfacin~ of Work Areas. Ail storage areas, parking areas and <br />driveway areas shall be surfaced with bituminous or concrete. <br /> <br />Building Permits. No construction or remodeling of any <br />structures shall commence prior to the issuance of a building <br />permit by the City Building official and site plan approval <br />by the City Council. <br /> <br />The buildinq's electrical system must be inspected and brought <br />uD to code within 30 days of this CUP. An affidavit of <br />compliance shall be filed with the City within five workin~ <br />days after final inspection. <br /> <br />The permit holder shall petition for City sewer and water <br />within 30 days of the date of action on this CUP. In the <br /> <br />event that the petition fails,.the permit holder shall install <br />an on-site system or submit an alternative sewage handling <br />treatment plan for Council approval. <br /> <br />Scope and Conduct of Operations. The operations permitted by <br />this CUP may be performed on the Subject Property in confor- <br />mance with existing statutory and regulatory authority and <br />requirements of the City, Anoka County, Minnesota ("County"), <br />and the Minnesota Pollution Control Agency ("MPCA"). <br /> <br />Furnaces. This permit shall be issued allowing for the use <br />of two melt furnaces as described by the applicant in the CUP <br />application support information. An increase in furnace <br />capacity or a third melt furnace shall not be added to the <br />operation without application and approval of an amended or <br />new CUP. ~ ...... <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.