Laserfiche WebLink
Park and Recreation Commission <br />Meeting Date: 03/14/2013 <br />By: Mark Riverblood, Engineering/Public <br />Works <br />Information <br />Title: <br />Recommend Park Monuments for The Draw - 2013 Parks Capital Improvement <br />5. 2. <br />Background: <br />On February 5th, 2013, the Park and Recreation Commission met with City Council in a joint work session for the <br />purposes of a preview of the 2013 Parks Capital Improvement Program (CIP). Consensus was generally that most <br />projects should move forward as discussed within the CIP document. <br />However, considerable discussion ensued regarding the two park entrance monuments (signs) for The Draw. <br />Discussion may be summarized between two views: <br />One shared by a couple Council members was that park signage need not cost several 10's of thousands of dollars. <br />Another position iterated was that these are indeed way -finding monuments, and are also expected to be in service <br />for many decades - and should be constructed in a manner that befits the 3 million dollar investment that represents <br />the 7-acre park's construction cost. (It may also be noted that the entrance monument at Central Park cost <br />approximately $50,000 in 1997.) <br />Notification: <br />Observations/Alternatives: <br />The purpose of this case is to further the discussion on the scope and cost of the proposed 2013 monuments for The <br />Draw. Several documents are attached to aid in the discussion: <br />• The COR sign design guidelines approved by City Council in December 2012 <br />• Exhibit showing the two monument or sign locations for The The Draw <br />• 'Cadillac' monument cost <br />• 'Chevrolet' monument cost <br />• 'Metro Geo' monument cost <br />Staff requested three estimates from sign maker Archetype from Minneapolis (based upon the approved COR sign <br />guidelines), in three quality/cost 'levels' fondly referred to herein as the 'Cadillac', 'Chevrolet' and 'Geo Metro' for <br />descriptive purposes. While the price points are outlined in the attachments, Staff does not have a perspective view <br />to compare these choices to, but has asked the vendor to prepare these to be available for the meeting. <br />It may also be noted that the intent for this element of the Parks CIP would be to have these installed if possible in <br />time for the The Draw Summer Concert Series beginning June 20th. (Attached also for your information is the <br />summer schedule of events.) <br />Funding Source: <br />The funding source is presently shown as $20,000 within the 2013 Parks CIP from the Park Improvement Trust <br />Fund. <br />Staff Recommendation: <br />