Laserfiche WebLink
current assets or the creation of other current liabilities. <br /> <br /> Subp. 28. Current postclosure care cost estimate. <br />"Current postclosure care cost estimate' means the most recent <br />estimate prepared in accordance with part 7035.2645. <br /> <br /> Subp. 29. Peco~sition gases. "Decomposition gases" <br />means gases produced by chemical or microbial activity during <br />the decomposition of solid waste. <br /> <br /> Subp. 30. Demolition debris. "Demolition debris" means <br />solid waste resulting from the demolition of buildings, roads, <br />and other man-~de structures including concrete, brick, <br />bituminous concrete, untreated wood, masonry, glass, trees, <br />rock, and plastic building parts. Demolition debris does not <br />include asbestos wastes. <br /> <br /> Subp. 31. Demolition debris land disposal facility. <br />"Demolition debris land disposal facility" means a site used to <br />dispose of demolition debris. <br /> <br /> Subp. 32. Design oal~acity. "Design capacity" means the <br />total volume of compacted solid waste, topsoil, intermittent, <br />intermediate, and final cover specified in the facility permit, <br />as calculated from final contour and cross-sectional plan sheets <br />that define the areal and vertical extent of the fill area. <br /> <br /> Subp. 33. Dis~)osal. "Disposal" has the meaning given it <br />in Minnesota Statutes, section 115A.03, subdivision 9. <br /> <br /> Subp. 34. Disposal facility. "Disposal facility" has the <br />meaning given it in Minnesota Statutes, section 115A.03, <br />subdivision 10. .- <br /> <br /> Subp. 35. Energy recovery facility. "Energy recovery <br />facility" means a site used to capture the heat value of solid <br />waste for conversion to steam, electricity, or immediate heat by <br />direct combustion or by first converting it into an intermediate <br />fuel product. <br /> <br /> Subp. 36. Existing facility. "Existing facility" means a <br />facility that is in operation or on which construction has <br />commenced on or before the effective date of new and amended <br />parts 7035.0300 to 7035.2875. A facility has commenced <br />construction if the owner or operator has obtained permits and <br />approvals necessary under federal, state, and local statutes, <br />rules, and ordinances and the on-site construction program has <br />begun or the owner or operator has entered into contractual <br />agreements that cannot be canceled or modified without <br />substantial loss. <br /> <br /> Subp0 37. Facility. "Facility" means the land, <br />structures, monitoring devices, and other improvements on the <br />land used for monitoring, treating, processing, storing, or <br />disposing of solid waste, leachate, or residuals from solid <br />waste processing. <br /> <br /> Subp. 38. F%o~plain. "Floodplain" means any land that is <br />subject to a one percent or greater chance of flooding in any <br />given year from any source. <br /> <br /> Subp. 39. Free liquid. "Free liguid" refers to the liquid <br /> <br />produced when a 100-milliliter representative sample of solid <br />waste is placed on a standard 40P-micron conical paint filter <br />for five minutes. <br /> <br /> Subp. 40. Garbage. "Garbage" means discarded material <br />resulting from the handling, processing, storage, preparation, <br />serving, and consumption of food. <br /> <br /> SUbD. ~ I <br /> ~ ~. Gross revenue. "Gross revenue" means total <br /> <br />40 <br /> <br /> <br />