My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/19/2013 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 02/19/2013 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:07:57 AM
Creation date
3/18/2013 1:28:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
02/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4988262v4 <br />a. Trunk and lateral sanitary sewer <br />b. Trunk and lateral water main <br />c. Storm drainage facilities <br />d. Streets — internal shared access /private driveway <br />e. Street traffic control signals — at access points to Sunwood Drive <br />f Trail development <br />g. Sidewalks <br />h. Electricity <br />i. Phone <br />j. Natural gas <br />k. Boulevard sodding — from sidewalk to property line <br />1. Water shut off boxes <br />(the "Stage I PERMITTEE Improvements "). <br />The PERMITTEE agrees to construct the Stage I PERMITTEE Improvements <br />according to the terms and conditions of this Contract and in accordance with the <br />Plans and the CITY Code. <br />5. Additional Requirements Related to Certain Stage I PERMITTEE <br />Improvements. The PERMITTEE must construct and complete the Stage I <br />PERMITTEE Improvements described in Sections 40, 4( ) and 4( ), under <br />traffic, must bring those Stage I PERMITTEE Improvements up to grade and <br />must restore existing conditions within 24 hours after <br />6. Lot Corner Staking. The PERMITTEE must install lot corner stakes at all lot <br />corners prior to the installation of the underground utilities described in Sections <br />4( ), 4( ) and 4( ). <br />7. Stage I PERMITTEE Improvement Financial Guarantee. The PERMITTEE <br />shall provide a financial guarantee to the CITY guaranteeing the construction of <br />the Stage I Improvements and their timely completion. The PERMITTEE shall <br />be responsible for a financial guarantee in the amount of Dollars <br />and No Cents ($ .00), which amount is 125% of the CITY Engineer's <br />estimated cost of the Stage I Improvements. Upon completion of Stage I <br />Improvements (including the removal of "temporary" erosion control measures as <br />identified in the approved Grading Plan), acceptance by the CITY, supported by <br />appropriate lien waivers, The PERMITTEE may request a reduction in the <br />amount of the financial guarantee. <br />8. Inspection Fees for the Stage I PERMITTEE Improvements. The <br />PERMITTEE shall provide an inspection fee to the CITY to inspect the Stage I <br />Improvements. The PERMITTEE shall be responsible for an inspection fee in <br />the amount of Dollars and No Cents ($ .00), which <br />amount is 5% of the City Engineer's estimated cost of the Stage I Improvements. <br />The inspection fee must be in the form of a cash escrow. The PERMITTEE may <br />request a refund of the remaining balance in the escrow upon completion of the <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.