My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 03/19/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:33:43 AM
Creation date
3/20/2013 11:11:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. APPROVE MINUTES <br />Motion by Councilmember Elvig, seconded by Councilmember McGlone, to approve the <br />minutes from the July 17, 2012 and October 16, 2012, Public Works Meetings. <br />Motion carried. Voting Yes: Chairperson Backous, Councilmembers Elvig, and McGlone. <br />Voting No: None. <br />5. COMMITTEE BUSINESS <br />5.01: Well #4 Motor and Pump Repair <br />Utilities Supervisor Nelson reviewed the staff report and explained the need to rebuild the Well <br />#4 pump and motor and replace the 130-foot drop pipe including the leaking check valve. He <br />presented the quotes received and indicated funding would be through the #9601 Water <br />Enterprise Fund. <br />Chairperson Backous asked about the workload of all eight pumps and the replacement plan. <br />Utilities Supervisor Nelson explained that some wells are used more than others and the City <br />tries to not use the two larger pumps during the winter months since the smaller pumps use less <br />electricity. He advised that Well #5 is the next one scheduled for replacement in several years. <br />Chairperson Backous asked if other quotes were obtained. <br />Utilities Supervisor Nelson stated they were not because it was a unique situation where you <br />have to pull the motor out of the ground to determine if something is wrong with it. <br />Chairperson Backous asked if the costs are reasonable. <br />Utilities Supervisor Nelson stated most of the City' s wells were constructed by E.H. Renner, a <br />fair company to work with. He indicated there are only three companies in the United States that <br />will fix a Hitachi motor and E.H. Renner said Submersible Motor Engineering USA is one of the <br />most reasonable and they have had the best luck with them. <br />Councilmember McGlone advocated for creating a pool of qualified companies for well repair so <br />the City does not find itself in special situations. He noted the City could bid out the work with a <br />three-year contract and during that time if something needs to be fixed, the City would already <br />have the price list. He stated he hopes the Council considers that in the New Year. <br />Councilmember Elvig asked about the warranty on the E.H. Renner work. <br />Utilities Supervisor Nelson stated the wear rings and impellors are new and portions of the pump <br />will need to be machined. He indicated he will get the information on their warranty, thinking it <br />is 12 months. <br />Public Works Committee / November 20, 2012 <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.