Laserfiche WebLink
Utilities <br />Description <br />36" Perforated Pipe <br />48" Catch Basin <br />15" RCP <br />12" PVC <br />geotextile Fabric <br />Excavation (removal) <br />2"Minus Rock <br />Abandon Storm Stub <br />Connect to Existing Storm <br />Connect to Existing Water <br />Connect to Existing Sewer <br />Sub -total - Utilities <br />Site Improvements <br />Description <br />public sidewalk <br />Private sidewalk <br />public ramp <br />Private sidewalk (hd) <br />Private steps <br />Grading <br />Erosion Control/SWPPP <br />Premium topsoil <br />Restoration / Sod <br />street light <br />remove curb <br />remove bituminous <br />milling <br />Class 5 Agg Base <br />Concrete Curb <br />Bit Base <br />Bit Wear <br />Striping - Epoxy <br />Pavement Messages <br />Signage <br />Iron Monumentation <br />Construction Staking <br />As-Builts <br />Boulevard Sod <br />Sub -total - Site Improvements <br />Engineer's Estimate <br />Northgate Performing Arts Center <br />March 20, 2013 <br />Estimated <br />Quantities Unit Unit Price Extension <br />244 LF $ 65.00 <br />3 EA $ 1,500.00 <br />190 LF $ 15.00 <br />75 LF $ 12.00 <br />600 SY $ 2.00 <br />220 CY $ 7.00 <br />156 CY $ 20.00 <br />1 LS $ 600.00 <br />1 EA $ 500.00 <br />1 EA $ 500.00 <br />1 EA $ 500.00 <br />Estimated <br />Quantities Unit <br />280 SY <br />184 SY <br />1 EA <br />52 SY <br />6 Steps <br />1 LS <br />1 LS <br />330 CY <br />2000 SY <br />2 ea <br />100 LF <br />200 SY <br />55 SY <br />730 TN <br />790 LF <br />245 TN <br />185 TN <br />1000 LF <br />5 EA <br />1 LS <br />1 LS <br />1 LS <br />1 LS <br />1000 SY <br />$ 15,860.00 <br />$ 4,500.00 <br />$ 2,850.00 <br />$ 900.00 <br />$ 1,200.00 <br />$ 1,540.00 <br />$ 3,120.00 <br />$ 600.00 <br />$ 500.00 <br />$ 500.00 <br />$ 500.00 <br />$ 32,070.00 <br />public <br />Unit Price Extension improvements <br />$ 32.00 $ 8,960.00 $ 8,960.00 Stage I <br />$ 32.00 $ 5,888.00 Stage I <br />$ 250.00 $ 250.00 $ 250.00 Dev Permit <br />$ 30.00 $ 1,560.00 Dev Permit <br />$ 100.00 $ 600.00 Dev Permit <br />$ 5,000.00 Dev Permit <br />$ 5,000.00 Dev Permit <br />$ 20.00 $ 6,600.00 Dev Permit <br />$ 3.20 $ 6,400.00 Dev Permit <br />$ 3,000.00 $ 6,000.00 Stage 11 <br />$ 5.00 $ 500.00 Dev Permit <br />$ 2.00 $ 400.00 Dev Permit <br />$ 2.00 $ 110.00 Dev Permit <br />$ 18.00 $ 13,140.00 Dev Permit <br />$ 14.00 $ 11,060.00 Dev Permit <br />$ 70.00 $ 17,150.00 Dev Permit <br />$ 75.00 $ 13,875.00 Dev Permit <br />$ 1.50 $ 1,500.00 Dev Permit <br />$ 250.00 $ 1,250.00 Dev Permit <br />$ 400.00 $ 400.00 Dev Permit <br />$ 750.00 $ 750.00 Stage 11 <br />$ 8,500.00 $ 8,500.00 Dev Permit <br />$ 2,500.00 $ 2,500.00 Dev Permit <br />$4.10 $ 4,100.00 Stage 1 <br />$ 17,500.00 <br />$ 5,000.00 <br />$ 133,993.00 $ 9,210.00 <br />