Laserfiche WebLink
il. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />Hazardous Wastes. No hazardous wastes, as defined by the U.S. <br />Environmental Protection Agency or Minnesota Pollution Control <br />Agency (MPCA), shall be burned, stored or handled at the <br />facility. <br /> <br />Ash. Ail ash from the facility shall be removed from the site <br />on a regular basis, shall not be stockpiled in excess of 35 <br />tons on the property, shall be stored indoors and shall be <br />processed or deposited in an U.S. Environmental Protection <br />Agency approved landfill. <br /> <br />Ash Disposal. Prior to the date this permit becomes <br />effective, Permit Holder shall submit a copy of the written <br />agreement or certification from the designated ash processing <br />and/or disposal facility that said facility is willing to <br />accept the ash. The Permit Holder shall notify the City of <br />any change in ash processing/disposal facilities within 30 <br />days of such change. <br /> <br />Wire Processing. The Permit Holdar shall not process wire by <br />melt operations on the Site. <br /> <br />Control of ODerations. Ail hauling, processing, separating, <br />disposal and other activities incidental to the aluminum <br />processing operation shall be conducted in conformance with <br />state and federal regulations and in accordance with the <br />applicable requirements of the Performance Standards of the <br />city Code (Section 170.017). Operations must be conducted so <br />as to minimize noise, safety, smoke or other nuisance concerns <br />to adjacent properties. <br /> <br />Pest Control. Insects and rodents on the site shall be <br />controlled and exterminated as needed and additional control <br />may be directed by the City Inspector subject to all <br />applicable laws, rules and regulations. <br /> <br />Litter Control. Danny's Aluminum Processing, Inc. shall be <br />responsible for removing debris caused by vehicles using the <br />aluminum processing facility. Debris removal activities <br />shall be instituted promptly following information of such <br />accumulation. In the event the Permit Holder fails to remove <br />debris within 24 hours of notice of accumulation by the City, <br />the City may cause such debris to be removed. The City shall <br />bill the cost of such removal to the Permit Holder and payment <br />shall be remitted within 30 days of the date of such billing. <br />Visual checks for debris accumulation shall be made at least <br />once daily by employees of the Pe~.it Holder. <br /> <br /> <br />