Laserfiche WebLink
Z~_BdJ]~L An As-Bullt drawlng shall be provlded to the City shc~lng <br />the location of the conductors between the breaker cablnet and the pole <br />or poles; these drawings shall be provided to the City by the contractor <br />prlor to the City acceptlng the street lights. <br /> <br />5. ~ All conductors, suitable for direct burial, will be type USE, <br /> copper cabie with ground. <br /> <br />6. Grounding: <br /> <br />At the breaker cabinet and at the end of each distribution circuit <br />there must be installed a drlven ground as required by National <br />Electric Code Article IZ50-84. <br /> <br />B. Any dlstrlbution clrcult over 300 feet In length must have a driven <br /> ground rod at mldpolnt. <br /> <br />C. Ground wire must be insulated wire suitable for direct burial. <br /> <br />Ae <br /> <br />For 120 volt circuits all conductors will be brought up the pole <br />and connections will be made at the fixture. Re ground wlre wlll be <br />connected to the grounding lug if provided. If there is no grounding <br />lug, the flxture shall be grounded to the mast arm. <br /> <br />Be <br /> <br />Where more t~aan one light is In line, a spilce will be made above <br />grade in the Junction box. Junction box shall be placed on the pole <br />approximately 1' above ground level. Splicing shall be done In the <br />Junction box and a In-the-line fuse shall be installed. <br /> <br />8. Photo Control: Photo control is to be faced as nearly north as practical. <br /> <br />9. Locks.' One-shot, loop-l~/pe locks are to be placed at each feed point by <br /> the elec-~rlcal contractor. <br /> <br />10. Cx~mDletlon: When street Ilghtlng Is completed by the Contractor, he shall <br /> contact the Electrical Inspector for inspection (Eugene Boyle, 755-1499 <br /> Re electrical contractor shall forward approved copy (blue) of electrical <br /> inspection to the City of Anoka or NSP. Re City of Anoka or NSP shall <br /> energize the lights and notify the City of addresses and date energized. <br /> Final acceptance Is not made until As-Bullts and 5 blue-line copies <br /> have been submitted to the Clt~/ Engineer by the Contractor. <br /> <br /> <br />