My WebLink
|
Help
|
About
|
Sign Out
Home
05/02/89
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1989
>
05/02/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:53:17 AM
Creation date
11/14/2003 2:03:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
05/02/1989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anoka Electric Cooperative <br />Anoka, MN 552[~3 <br />12-17-87 <br /> <br />Board Policy 214 <br /> STREET LIGHTS <br /> <br />I. OBJECTI \~ <br /> <br />To set forth the terrs and conditions for street lighting systems to <br />illuminate public roadways within the Cooperati~q's service territory. <br /> <br />II. POLICY <br /> <br /> Upon proper application, the Cooperative shall furnish, install and <br /> maintain complete street lighting systems for municipalities and/or <br /> other governing bodies within the cooperativq's service area or, if <br /> desired, shall provide only electrical energy to customer (member)- <br /> owned systems. Energy will be unmetered and the energy rate shall be <br /> based on a cost-of-service analysis and recomputed and established <br /> concurrent with each chance in the Cooperati~'s published electric <br /> rates. The Cooperative shall maintain an accurate accounting of all <br />· installations, relocations, and removals so that applicable charges may <br /> be calculated on a "current month" basis for each monthly billing. <br /> <br />· A. Coo.~erative-C~eg Li~htina System <br /> <br />In street lighting systems o~med by the Cooperative, the customer <br />shall select from the Cooperative's standard designs, the t)~pe of <br />system and style of fixture appropriate for the particular <br />situation, and s~!! indicate preferred installation locations. <br /> <br />The monthly rate for a cooperative--owned lighting system shall have <br />two co ~mponents, (1) ~n ener~a~f rate and (2) a facilities charge. <br />The facilities charge includes both the cost of ownership'of a <br />standard street lighting system and all associated repair and <br />7:irtenance costs. <br /> <br />If the Cooperative is subject to installation costs above and <br />beyond the costs for a st~]dard installation, the customer will be <br />required to pay, in advance, an appropriate one-time charge as a <br />contribution in aid of construction. <br /> <br />B. Customer (Mem~er}~ned LichtiDo System <br /> <br />In street lighting systems installed and/or owned by a municipal <br />and/or other gove~ing bo~y, the Cooperative will provide electric <br />service at a designated .Dower ~int. It will be the res~nsibi!ity <br />of the customer to repair and maintain all such lighting system <br />equipment. <br /> <br />The monthly rate for a custo~er-o~med street lighting system shall <br />be for energy only. <br /> <br />!ii. <br /> <br /> 5oard Minutes 7-!6-~!, !2-!7-S7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.