Laserfiche WebLink
WETLAND: <br />replatting costs. Two, replatting or redevelopment of the subject property terminates the <br />temporary easement for the road that connects 167th to Emlcrest Park. <br />NOTE: The city is in the process of developing a master plan with the parcels located off <br />167th (to the north of the subject property). <br />There are no issues with wetlands that would make this property unusable; or, effect <br />adjacent properties. NOTE 1: The owner of the property to the west is considering the <br />use of their property for wetland banking. NOTE 2: There is a wetland in the northern <br />portion of lot #1 and in both the southeast and southwest corners of lot #2. The <br />southern portion of lot #2 could be used for banking in the northern portion if desired. <br />MAINTENANCE: Mowed 12 times per year—$100 per event ($1,200 per year). <br />