~_BJZ~J_t~_~ An As-Built drawing shall be provided to the City show lng <br />the location of the conductors between the breaker cabinet and the pole <br />or poles; these drawings shall be provlded to the City by the contractor <br />prlor to the City accepting the street Ilghts. <br /> <br />5. Cables: All conductors, suitable for direct burial, will be type USE, <br /> copper cabie with ground. <br /> <br />At the breaker cablnet and at the end of each distribution clrcult <br />there must be Installed a drlven ground as requlred by National <br />Electric Code Article f250-84. <br /> <br />B. Any distribution clrcult over 300 feet In length must have a drlven <br /> ground rod at midpoint. <br /> <br />C. Ground wire must be Insulated wlre suitable for direct burial. <br /> <br />7..Circuits: <br /> <br />For 120 volt clrcults ail conductors will be brought up ~he pole <br />and connections will be made at the fixture. Re ground wire will be <br />connected to the grounding lug If provided. If there Is no grounding <br />lug, the fixture shall be grounded to the mast arm. <br /> <br />Where more than one light Is In llne, a splice wlll be made above <br />grade in the Junction box. Junction box shall be placed on the pole <br />approximately 1' above ground level. Splicing shall be done In the <br />Junction box and a In-the-llne fuse shall be installed. <br /> <br />8. photo Control: Photo control Is to be faced as nearly north as practical. <br /> <br />g. ~ One-shot, loop-type locks are to be placed at each feed point by <br /> the electrical contractor. <br /> <br />10. GOmDletlon~ When street lighting is completed by the Contractor, he shall <br /> contact the Electrical Inspector for lnspe~tlon (Eugene Boyle, 755-1499 <br /> Re electrical contractor shall forward approved copy (blue) of electrical <br /> Inspectlon to the Cluny of Anoka or NSP. Re City of Anoka or NSP shall <br /> energize the lights and notify the City of addresses and date energized. <br /> Final acceptance is not made until As-Builts and 5 blue-line copies <br /> have been submitted to the City Engineer by the Contractor. <br /> <br /> <br />