Laserfiche WebLink
18. <br /> <br />19. <br /> <br />Does any part of'the project area mvotve: <br />a. shoreland zoning dlstr;cl? <br />b. delineated lO0-year flood plain? <br />c. stale or federally designaled river land use district? <br />If ye~. ldentt~y water body and applicable state classification(s), and describe measures <br />to protect water and relaled land resources: <br />Se-~ a~ta~hed . <br /> <br />Describe any physical alteration (e.g.. d~kes, excavation, fill. stream diversion) of any <br />drainage s~tem, lake, stream, and/or wetland. Describe measures to minimize im- <br />pairment o1' the water-related resources. EstimaTe quantity of material to be dredged <br />and indicate where spoils u~il~ be deposited. <br /> <br />See attached <br /> <br />No <br />No <br />No <br /> <br />Yes <br /> <br />0. a. Wi]l the project require an appropriation of ground or surface water? ]f yes, explain <br /> (l..~.dicale 0uantity and source): <br /> Utility' cons[ruc[ion dewa[erJng w~ll require a D.N.R. permit. <br /> <br /> b.Will the ptojecl affect groundwalet' levels in any wells (on or o~f the site)? l~ yes, ex- <br /> plain: <br /> <br />21. <br /> <br />Describe the erosion and sedimentation control measures to be used during and aher <br />construction of the project. <br /> <br />S~e attached <br /> <br />~ No <br /> <br />[~ No <br /> <br />'~'e s <br /> <br />Yes <br /> <br />22. <br /> <br />a. t~Vill ~he project generate: <br />1. surface and storrnwa~er runoff?. ' ' <br /> 2. sanitary, wastewater? <br /> 2. industrial wastewater? <br /> 4. coo. ling water (contact and noncontact)? <br /> If yes. identi~T sources, volumes, quality (if other than normal domesti~ sewage), <br /> and treatment methods. Give the basis or methodology of estimates. <br /> <br />See at:ached <br /> <br />No <br />No <br />No <br />No <br /> <br />~es <br />Yes <br />Yes <br />Yes <br /> <br />23. <br /> <br />b. ldentif~' receiving walers, including groundwater, and evaluate ~he impacts of the <br /> discharges listed above. If discharges to groundwater are anticipated, provide per- <br /> colation/permeability and other hydrogeoiogica! test data. i, available. <br /> <br />See =ttached <br /> <br />Will the project generate (either during or aher construction): <br />a. air pollution? <br />b. dus:? <br />c. noise? <br />d. odors? <br />If yes, explain, including as appropriate: distances to sensitive land uses: expected lev- <br />els and duration of noise: n,..pes and quantities of air pollutants from stacks, mobile <br />sources, and fugitive emissions (dust): odor sources: and mitigative measures for any <br />impacts. Give ~he basis or methodolog? of estimates. <br /> <br />See attached <br /> <br />~] No <br /> <br />'YeS <br /> <br />Yes <br />Yes <br /> <br />3 <br /> <br /> <br />