My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 05/14/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:15:01 AM
Creation date
5/10/2013 8:34:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOD Funding Request Worksheet <br />Grant -Funded Activities LCDA Pre- <br />Development <br />TOD <br />TBRA Site <br />Investigation <br />TOD <br />TBRA Cleanup <br />TOD <br />LCDA <br />Development <br />TOD <br />Conduct design workshops for development alternatives <br />Prepare redevelopment, corridor or station area plans <br />Develop zoning and land use implementation tools <br />Analysis of alternatives for market mix, land use mix, <br />economic feasibility, or for air, water or energy issues <br />Soil testing to determine feasible land uses for a specific site <br />Site -specific surface water management <br />Development staging plans <br />Determining strategies for land banking and land acquisition <br />Land acquisition after the date of award <br />Land acquisition up to 12 months prior to application due <br />date (see Application Guide) <br />Holding costs <br />Geotechnical work <br />Conducting Phase I & Phase II environmental site <br />assessments <br />Preparation of RAPs or DRAPs <br />Preparation of asbestos abatement plans that meet AHERA <br />standards <br />Preparation of lead -based paint abatement plans <br />Asbestos abatement area containment <br />Asbestos removal or encapsulation <br />Lead -based paint removal or stabilization <br />Asbestos and/or lead -based paint abatement <br />Demolition and removal of obsolete structures (TBRA: <br />contaminated areas only; LCDA: non -contaminated areas <br />only) <br />Grading and soil correction (TBRA: contaminated areas <br />only; LCDA: non -contaminated areas <br />$ 106,810 <br />Excavation, transportation, disposal fees for removal of <br />contaminated soil, backfill and grading of clean soil <br />Backfill to replace contaminated fill with clean fill <br />Soil vapor mitigation <br />Costs to document environmental monitoring systems or <br />successful implementation of a RAP (e.g., technical writing) <br />New or realigned streets, including lighting and signage; <br />sidewalks and benches <br />$ 268,365 <br />Public -use or shared -use parking structures <br />Extensions/modifications of local public sewer, water or <br />telecommunication lines <br />$ 112,915 <br />Public connecting elements, including sidewalks and trails <br />that connect to transit and other surrounding public places <br />$ 49,406 <br />Site -integrated transit shelters, permanent bike racks, or <br />bridges <br />Stormwater management improvements <br />Placemaking functional elements <br />Design and engineering for LCDA Development TOD eligible <br />items <br />$ 112,873 <br />Project coordination <br />$ 650,369 <br />
The URL can be used to link to this page
Your browser does not support the video tag.