Laserfiche WebLink
1 <br />5 cu 4 e ,r- <br />Price Summary Sheet A <br />Clean Up and Removal Services <br />Page 1 of 2 <br />Services <br />Hourly Rate <br />Daily Rate <br />Other <br />5 hr Mi nimum <br />Labor (laborer, machine operator` etc) <br />Labor <br />60.00 <br />5 <br />hr minimum -` <br />300.00 <br />TruckOperator <br />'n e & OAe <br />Machine <br />70.00 <br />5 hr minimum <br />l 350.00 <br />Equipment (skid steer, dump truck, etc) <br />ASV 100 Skid Steer with Tracks <br />70.00 <br />5 hr minimum <br />350.00 <br />90 Case Skid Steer <br />50.00 <br />T hr minimum <br />250.00 <br />J :Chgata Loader <br />70.00 <br />5 hr minimum <br />350.00 <br />D-31-P Dozer <br />50.00 <br />5 hr minimum <br />250.00 <br />Dumpsters (size and type): <br />Mixed Waste <br />48.00/Ton <br />2 Ton Minimum,% <br />96.00 <br />Construction Waste <br />35.00/Ton <br />2 ton Minimum, <br />70.00 <br />Transportation Costs (mileage, mobilization, etc) <br />70 cubic yard <br />Truck & Trailer 60 cubic yard <br />50 cubic yard <br />j 35.00 <br />5 hr minimum <br />175.00 <br />— <br />Lowboy <br />r�„ar1 thump Tnick <br />50.00 <br />35.00 <br />5 hr minimum <br />250.00 <br />1 <br />