My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/21/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 05/21/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:34:18 AM
Creation date
5/22/2013 3:42:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/21/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
asphalt that would be suitable for this project. He described the components of the proposed <br />crosswalk and warning signs. Public Works Superintendent Riemer presented the cost estimate <br />of $15,500 and recommendation to install standard pedestrian crosswalk signage and striping, <br />with connecting trails to provide access to Alpine Park for residents of Alpine Estates. He <br />advised that flashing crosswalk signs cost about $5,000 and the type used by the City of Anoka <br />cost $28,000, noting this project would not warrant that level of expense. <br />Chairperson Backous asked about the elevation of the crosswalk at Alpine Drive and towards the <br />parking lot. <br />Public Works Superintendent Riemer indicated it is a hill and would cost $38,000 to install <br />concrete steps; however, that would not comply with ADA requirements. He suggested if it is <br />seen that people are cutting across, steps could be considered in the future. <br />Chairperson Backous asked about the cost for green treated timber steps. <br />Public Works Superintendent Riemer stated that is an option in the area that is not as steep, <br />towards the middle of the trail. <br />Chairperson Backous asked about a more gradual slope where topography would allow. <br />Public Works Superintendent Riemer stated he thinks people will more than likely cut across the <br />street than to travel 200 feet in the other direction to use the crosswalk. <br />Chairperson Backous raised the option of a trail that sloped to the west, which may encourage <br />pedestrians to stay on the trail and use the crosswalk. <br />Parks and Assistant Public Works Superintendent Riverblood stated this is difficult because the <br />project results in putting in a $15,000 crosswalk and residents will likely cross at the intersection. <br />Councilmember Kuzma asked if flashing lights are required. <br />Public Works Superintendent Riemer stated the flashing lights are not needed. <br />Mayor Strommen noted the funding is from Public Works. <br />Public Works Superintendent Riemer described the material the City has on hand for this project <br />and indicated the hard costs are for the curb cuts. <br />Chairperson Backous asked staff to explore making a gradual cut path that could pass ADA <br />requirements (5% grade). He felt with the proposed design, pedestrians will just cut across the <br />street. <br />Mayor Strommen agreed a gradual cut path was an option worth exploring. <br />Public Works Committee / April 16, 2013 <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.