My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/06/2013
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2013
>
Agenda - Planning Commission - 06/06/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:18:05 AM
Creation date
6/6/2013 9:18:37 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/06/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
future, RTC LLC would need to escrow an amount of funds sufficient to construct the <br />additional wetland acreage not provided for on -site. <br />Site #2 is located along the south - southeast side of Lake Itasca on land already owned <br />by the City of Ramsey. This area currently contains some excellent quality shrub swamp, <br />wet prairie and emergent marsh along the shores of Lake Itasca. A suitable site could be <br />located where wetland does not currently exist, but where adequate hydrology is <br />available. There are also several areas of reed canary -dominated wetland that could be <br />improved for public value credit though re-establishment of native wetland communities. <br />Any wetland improvements in this area could be designed to also improve Blanding's <br />turtle habitat. <br />The following are proposed to mitigate impacts associated with the stormwater outfall to <br />the Mississippi River: <br />Reduce Frequency of Stormwater Discharge, Lower Magnitude of Peak Flow Rates: The <br />RTC project incorporates a variety of strategies to lower increases in stormwater rate and <br />volume. While all stormwater conveyance features are designed to accommodate the <br />100-year runoff event without taking infiltration into consideration, on -site retention and <br />infiltration can be incorporated at multiple scales into the RTC during the detailed design <br />phase for smaller storm retention. Peak flow rates for the 100-year, 24-hour runoff and <br />100-year, 10-day snowmelt events are 25.1 cfs and 25.3 cfs respectively. <br />Oversize Culvert and Reduced Slope at Outfall. The last section of culvert will be <br />enlarged from 21-inches to 36-inches and include an apron and rip -rap to lower velocities <br />and dissipate the energy at the discharge point. This will minimize the potential for scour <br />and erosion. <br />Directional Boring to Install Culvert: If possible, the culvert will be placed within the <br />river bank by directional boring rather than an open cut. This will reduce the need to <br />remove shoreline vegetation and will minimize the area of disturbance. Erosion control <br />measures will be implemented where soil is disturbed. All disturbed areas will be <br />replanted to native trees, shrubs, grasses and forbs and if appropriate, a temporary cover <br />crop will be established. <br />12-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.