My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 04/16/2013
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2013
>
Minutes - Public Works Committee - 04/16/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:56:30 PM
Creation date
6/10/2013 1:11:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
04/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks and Assistant Public Works Superintendent Riverblood asked about the angle westerly, not <br />toward the playground, where the grade can be long enough and laid in with Class V. Then the <br />pedestrian ramp at the entrance to Alpine Park can be moved west of the shelter where there is <br />not as much traffic. <br />Public Works Superintendent Riemer stated staff will shoot the elevation grades to see if that is a <br />viable option. <br />Parks and Assistant Public Works Superintendent Riverblood stated bicyclists may also enjoy <br />using a gradual trail. <br />Councilmember Riley noted it makes the City look silly to put a crosswalk in a location where <br />people would not use it, or where residents requested it to be located. <br />The consensus of the Public Works Committee was to ask staff to determine elevations as <br />discussed and whether it would be an option to create a more gradual pathway. <br />6. COMMITTEE / STAFF INPUT — CONTINUED <br />6.01: Review of 2012 -2013 Winter Maintenance Activities <br />Public Works Superintendent Riemer reported on the Public Work's scale of operation, snow <br />removal routes, 2012 -2013 winter maintenance activities, and types of equipment used for <br />snowplowing. He reviewed the types of comments and complaints most commonly received and <br />how they are addressed. Public Works Superintendent Riemer advised of changes expected for <br />2013 -2014 including salt cost, installing AVL equipment in large plow equipment, changing <br />policy to make townhome associations responsible for their sidewalks, and to address resident <br />requests to not leave windrows across driveways when plowing trails. <br />Chairperson Backous asked about the cost for the private weather service subscription. <br />Public Works Superintendent Riemer estimated $800 to $1,200 and advised it is worth the cost, <br />noting it is also used during summer storms. <br />Chairperson Backous asked why the City cannot use the AVL system to give live web updates <br />on plowing. <br />Public Works Superintendent Riemer stated there is potential the system would crash if too many <br />logged on. <br />Chairperson Backous stated he would like to get more information about that issue, noting the <br />City may need a slight increase in bandwidth, and he thinks offering live updates would be a <br />huge benefit to residents. Chairperson Backous asked how long Ramsey has had eight routes. <br />Public Works Superintendent Riemer stated it has been a while and staff would like to add a <br />truck in 2015 because the City's equipment was getting to the limit. He noted Anoka has 65 <br />Public Works Committee / April 16, 2013 <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.